My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R.L. Alia Company 10/17/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
R.L. Alia Company 10/17/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/31/2023 10:29:29 AM
Creation date
10/17/2023 9:12:24 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
R.L. Alia Company
Approval Date
10/17/2023
Council Approval Date
10/4/2023
Department
Public Works
Department Project Manager
Erik Emerson
Subject / Project Title
Beverly Lake Water Quality Retrofit
Tracking Number
0003987
Total Compensation
$1,175,015.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
R.L. Alia Company 10/30/2023
(Attachment)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
R.L. Alia Company 10/30/2023 (2)
(Attachment)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
497
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> <br />Beverly Lake Water Quality RetrofitDivision P – PROPOSAL August 2023 <br />Work Order No. – UP3745 SP – 17 <br /> <br />SUBCONTRACTORS FORM <br />1. For heating, ventilation, air conditioning, plumbing (as defined by RCW Chap. 18.106) and electrical <br />work (as defined by RCW Chap. 19.28), and structural steel installation and rebar installation, Bidder <br />MUST either identify itself or Subcontractors in the chart below. If Bidder believes such work is not <br />part of the scope of Work, Bidder shall write “NO WORK”. <br />2. Bidder shall not list more than one Subcontractor for each category of work identified, unless <br />Subcontractors vary with bid alternates, in which case the Bidder must indicate which Subcontractor <br />will be used for which alternate. <br />3. Bidder’s bid shall be deemed nonresponsive and void if: <br />A. For heating, ventilation, air conditioning, plumbing, electrical, structural steel installation and <br />rebar installation, Bidder fails (1) to submit as part of the Bid the names of such Subcontractors, <br />(2) to name itself to perform such Work, or (3) to write “No Work”; or <br />B. Bidder names two or more Subcontractors to perform the same work. <br />4. The requirement to name the Bidder's proposed heating, ventilation and air conditioning, plumbing, <br />electrical, structural steel installation and rebar installation subcontractors applies only to proposed <br />heating, ventilation and air conditioning, plumbing, electrical, structural steel installation and rebar <br />installation subcontractors who will contract directly with the general contractor submitting the Bid to <br />the City. <br />5. The heating, ventilation and air conditioning, plumbing, electrical portions of the chart below must be <br />submitted with the bid proposal or within one hour of the published bid submittal time. <br />6. The structural steel installation and rebar installation portions of the chart below must be submitted <br />with the bid proposal or within forty-eight hours of the published bid submittal time. <br /> <br />Type/Scope of Work Name and Address of Subcontractor/Or Bidder <br />HEATING <br />Subcontractor, bidder or “no work” MUST be <br />stated <br /> <br />VENTILATION AND AIR CONDITIONING <br />Subcontractor, bidder or “no work” MUST be <br />stated <br /> <br />PLUMBING (as described in RCW Chap. 18.106) <br />Subcontractor, bidder or “no work” MUST be <br />stated <br /> <br />ELECTRICAL (as described in RCW Chap. <br />19.28) <br />Subcontractor, bidder or “no work” MUST be <br />stated <br /> <br />STRUCTURAL STEEL INSTALLATION <br />Subcontractor, bidder or “no work” MUST be <br />stated <br /> <br />REBAR INSTALLATION <br />Subcontractor, bidder or “no work” MUST be <br />stated <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.