Laserfiche WebLink
CITY OF EVERETT SPECIAL PROVISIONS <br /> <br />Beverly Lake Water Quality RetrofitDivision P – PROPOSAL August 2023 <br />Work Order No. – UP3745 SP – 17 <br /> <br />SUBCONTRACTORS FORM <br />1. For heating, ventilation, air conditioning, plumbing (as defined by RCW Chap. 18.106) and electrical <br />work (as defined by RCW Chap. 19.28), and structural steel installation and rebar installation, Bidder <br />MUST either identify itself or Subcontractors in the chart below. If Bidder believes such work is not <br />part of the scope of Work, Bidder shall write “NO WORK”. <br />2. Bidder shall not list more than one Subcontractor for each category of work identified, unless <br />Subcontractors vary with bid alternates, in which case the Bidder must indicate which Subcontractor <br />will be used for which alternate. <br />3. Bidder’s bid shall be deemed nonresponsive and void if: <br />A. For heating, ventilation, air conditioning, plumbing, electrical, structural steel installation and <br />rebar installation, Bidder fails (1) to submit as part of the Bid the names of such Subcontractors, <br />(2) to name itself to perform such Work, or (3) to write “No Work”; or <br />B. Bidder names two or more Subcontractors to perform the same work. <br />4. The requirement to name the Bidder's proposed heating, ventilation and air conditioning, plumbing, <br />electrical, structural steel installation and rebar installation subcontractors applies only to proposed <br />heating, ventilation and air conditioning, plumbing, electrical, structural steel installation and rebar <br />installation subcontractors who will contract directly with the general contractor submitting the Bid to <br />the City. <br />5. The heating, ventilation and air conditioning, plumbing, electrical portions of the chart below must be <br />submitted with the bid proposal or within one hour of the published bid submittal time. <br />6. The structural steel installation and rebar installation portions of the chart below must be submitted <br />with the bid proposal or within forty-eight hours of the published bid submittal time. <br /> <br />Type/Scope of Work Name and Address of Subcontractor/Or Bidder <br />HEATING <br />Subcontractor, bidder or “no work” MUST be <br />stated <br /> <br />VENTILATION AND AIR CONDITIONING <br />Subcontractor, bidder or “no work” MUST be <br />stated <br /> <br />PLUMBING (as described in RCW Chap. 18.106) <br />Subcontractor, bidder or “no work” MUST be <br />stated <br /> <br />ELECTRICAL (as described in RCW Chap. <br />19.28) <br />Subcontractor, bidder or “no work” MUST be <br />stated <br /> <br />STRUCTURAL STEEL INSTALLATION <br />Subcontractor, bidder or “no work” MUST be <br />stated <br /> <br />REBAR INSTALLATION <br />Subcontractor, bidder or “no work” MUST be <br />stated <br /> <br /> <br />