My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R.L. Alia Company 10/17/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
R.L. Alia Company 10/17/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/31/2023 10:29:29 AM
Creation date
10/17/2023 9:12:24 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
R.L. Alia Company
Approval Date
10/17/2023
Council Approval Date
10/4/2023
Department
Public Works
Department Project Manager
Erik Emerson
Subject / Project Title
Beverly Lake Water Quality Retrofit
Tracking Number
0003987
Total Compensation
$1,175,015.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
R.L. Alia Company 10/30/2023
(Attachment)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
R.L. Alia Company 10/30/2023 (2)
(Attachment)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
497
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> <br />Beverly Lake Water Quality RetrofitDivision B – BID DESCRIPTIONS August 2023 <br />WO No. – UP3745 SP - 31 <br /> <br /> <br />Bid Item 21 - Water Quality Treatment Structure #1 <br />Measurement and Payment: Lump Sum (LS) <br />The lump sum price for Water Quality Treatment Structure #1 shall be full compensation for <br />all labor, materials, incidentals, tools and equipment necessary to satisfactorily complete the <br />work as defined in these Contract Documents. The lump sum price does not include <br />procuring the precast structure which will be provided by the City of Everett. All items <br />identified as “contractor to provide” in the Drawings shall be included in this bid item. <br /> <br />The lump sum price includes, but is not limited to, excavation, installation and backfill of the <br />water quality treatment structure, connection to storm drains and installation of the internal <br />components, and transporting the structure from the designated pick up point to the site. All <br />items identified as “contractor to provide” in the Drawings shall be included in this bid item. <br />The lump sum price shall include all bedding, gravel borrow, or other soil material associated <br />with the water quality structure, including haul. <br /> <br />The lump sum price includes, but is not limited to, installing cartridges, initial cleaning, <br />commissioning, any documentation and all required maintenance and guarantees described <br />herein. <br /> <br />Bid Item 22 - Water Quality Treatment Structure #2 <br />Measurement and Payment: Lump Sum (LS) <br />The lump sum price for Water Quality Treatment Structure #2 shall be full compensation for <br />all labor, materials, incidentals, tools and equipment necessary to satisfactorily complete the <br />work as defined in these Contract Documents. The lump sum price does not include <br />procuring the precast structure which will be provided by the City of Everett. <br /> <br />The lump sum price includes, but is not limited to, excavation, installation, backfill and <br />compaction of the water quality treatment structure, connection to storm drains and <br />installation of the internal components, and transporting the structure from the designated <br />pick up point to the site. The lump sum price shall include all bedding, gravel borrow, or other <br />soil material associated with the water quality structure, including haul. <br /> <br />The lump sum price includes, but is not limited to, installing filtration media, initial cleaning, <br />commissioning, any documentation, and all required maintenance and guarantees described <br />herein. <br /> <br />Bid Item 23 - Water Quality Treatment Structure #3 <br />Measurement and Payment: Lump Sum (LS) <br /> <br />The lump sum price for Water Quality Treatment Structure #3 shall be full compensation for <br />all labor, materials, incidentals, tools and equipment necessary to satisfactorily complete the <br />work as defined in these Contract Documents. <br />
The URL can be used to link to this page
Your browser does not support the video tag.