My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R.L. Alia Company 10/17/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
R.L. Alia Company 10/17/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/31/2023 10:29:29 AM
Creation date
10/17/2023 9:12:24 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
R.L. Alia Company
Approval Date
10/17/2023
Council Approval Date
10/4/2023
Department
Public Works
Department Project Manager
Erik Emerson
Subject / Project Title
Beverly Lake Water Quality Retrofit
Tracking Number
0003987
Total Compensation
$1,175,015.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
R.L. Alia Company 10/30/2023
(Attachment)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
R.L. Alia Company 10/30/2023 (2)
(Attachment)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
497
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> <br />Beverly Lake Water Quality RetrofitDivision B – BID DESCRIPTIONS August 2023 <br />WO No. – UP3745 SP - 35 <br /> <br />The unit price per square yard for Temporary Pavement Patch in accordance with Standard <br />Specifications, 5-06.3(6) of these Special Provisions and as shown on the Plans shall be full <br />compensation for all work necessary to complete Temporary Pavement Patch in accordance <br />with these specifications. <br />Regardless of duration or sequence of work, this item will be measured and paid one time. <br /> <br />Bid Item 35 - Temporary Water Main Protection <br />Measurement and Payment: Unit Price per Lump Sum (LS) <br />Measurement for providing Temporary Water Main Protection will be lump sum. <br /> <br />The lump sum price for Landscape Restoration shall be full compensation for providing, <br />installing, maintaining, removing and disposal of temporary water main protection measures <br />as indicated in the Drawings or otherwise approved by the Engineer. The lump sum price <br />shall include all earthwork required to install the temporary measures which is not paid under <br />other bid items. <br /> <br />Also included shall be all time and expenses required to coordinate water shutoffs with the <br />City and residents. <br /> <br />Bid Item 36 - Controlled Density Fill <br />Measurement and Payment: Cubic Yard (CY) <br />The unit price per cubic yard for controlled density fill (CDF) shall be full compensation for all <br />labor, material, incidentals, tools and equipment necessary to furnish, deliver, and place <br />controlled density fill for trench backfill above the pipe zone where indicated and as required <br />by the Engineer, from a Contractor-supplied source, in accordance with DCSS Section 3-9.6 <br />and 3-20.1, the Standard Specifications, Special Provisions and Contract Plans. <br />Measurement for controlled density fill will be measured by the cubic yard for the quantity of <br />material placed by neatline calculations, within limits of dimensions defined in the Work, <br />descriptions of other bid items, shown on the Plans, details or COE Standard Drawings or as <br />otherwise approved by the Engineer. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.