Laserfiche WebLink
CITY OF EVERETT SPECIAL PROVISIONS <br /> <br />Beverly Lake Water Quality RetrofitDivision B – BID DESCRIPTIONS August 2023 <br />WO No. – UP3745 SP - 35 <br /> <br />The unit price per square yard for Temporary Pavement Patch in accordance with Standard <br />Specifications, 5-06.3(6) of these Special Provisions and as shown on the Plans shall be full <br />compensation for all work necessary to complete Temporary Pavement Patch in accordance <br />with these specifications. <br />Regardless of duration or sequence of work, this item will be measured and paid one time. <br /> <br />Bid Item 35 - Temporary Water Main Protection <br />Measurement and Payment: Unit Price per Lump Sum (LS) <br />Measurement for providing Temporary Water Main Protection will be lump sum. <br /> <br />The lump sum price for Landscape Restoration shall be full compensation for providing, <br />installing, maintaining, removing and disposal of temporary water main protection measures <br />as indicated in the Drawings or otherwise approved by the Engineer. The lump sum price <br />shall include all earthwork required to install the temporary measures which is not paid under <br />other bid items. <br /> <br />Also included shall be all time and expenses required to coordinate water shutoffs with the <br />City and residents. <br /> <br />Bid Item 36 - Controlled Density Fill <br />Measurement and Payment: Cubic Yard (CY) <br />The unit price per cubic yard for controlled density fill (CDF) shall be full compensation for all <br />labor, material, incidentals, tools and equipment necessary to furnish, deliver, and place <br />controlled density fill for trench backfill above the pipe zone where indicated and as required <br />by the Engineer, from a Contractor-supplied source, in accordance with DCSS Section 3-9.6 <br />and 3-20.1, the Standard Specifications, Special Provisions and Contract Plans. <br />Measurement for controlled density fill will be measured by the cubic yard for the quantity of <br />material placed by neatline calculations, within limits of dimensions defined in the Work, <br />descriptions of other bid items, shown on the Plans, details or COE Standard Drawings or as <br />otherwise approved by the Engineer. <br /> <br />