My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R.L. Alia Company 10/17/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
R.L. Alia Company 10/17/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/31/2023 10:29:29 AM
Creation date
10/17/2023 9:12:24 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
R.L. Alia Company
Approval Date
10/17/2023
Council Approval Date
10/4/2023
Department
Public Works
Department Project Manager
Erik Emerson
Subject / Project Title
Beverly Lake Water Quality Retrofit
Tracking Number
0003987
Total Compensation
$1,175,015.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
R.L. Alia Company 10/30/2023
(Attachment)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
R.L. Alia Company 10/30/2023 (2)
(Attachment)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
497
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br />1-04 SCOPE OF THE WORK ......................................................................................... 60 <br />1-04.1 Intent of the Contract ........................................................................... 60 <br />1-04.2 Coordination of Contract Documents, Plans, Special Provisions <br />Specifications, and Addenda ......................................................................................... 61 <br />1-04.3 Reference Information ......................................................................... 62 <br />1-04.4 Changes .............................................................................................. 62 <br />1-04.4 Changes .............................................................................................. 62 <br />1-04.5 Procedure, Protest, and Dispute by the Contractor .............................. 64 <br />1-04.5 Notice by Contractor (******) ............................................................... 64 <br />1-04.7 Differing Site Conditions (Changed Conditions) ................................... 66 <br />1-05 CONTROL OF WORK ............................................................................................ 66 <br />1-05.1 Authority of the Engineer ..................................................................... 66 <br />1-05.1 City (******) .......................................................................................... 66 <br />1-05.2 Authority of Assistants and Inspectors ................................................. 68 <br />1-05.2 City’s Representative (******) .............................................................. 68 <br />1-05.3 Working Drawings ............................................................................... 69 <br />1-05.4 Conformity With and Deviations From Plans and Stakes ..................... 72 <br />1-05.6 Inspection of Work and Materials ......................................................... 73 <br />1-05.7 Removal of Defective and Unauthorized Work .................................... 74 <br />1-05.10 Guarantees.......................................................................................... 75 <br />1-05.11 Final Inspection ................................................................................... 76 <br />1-05.11 Final Inspections and Operational Testing (******) ............................... 76 <br />1-05.12 Final Acceptance ................................................................................. 77 <br />1-05.13 Superintendents, Labor and Equipment of Contractor ......................... 78 <br />1-05.14 Cooperation With Other Contractors .................................................... 78 <br />1-05.16 Water and Power ................................................................................. 80 <br />1-05.17 Oral Agreements ................................................................................. 80 <br />1-05.18 Contractor ........................................................................................... 80 <br />1-05.19 City-Contractor Coordination (******) .................................................... 83 <br />1-06 CONTROL OF MATERIAL ..................................................................................... 84 <br />1-06.1 Approval of Materials Prior to Use ....................................................... 84 <br />1-06.2 Acceptance of Materials ...................................................................... 85 <br />1-06.3 Manufacturer’s Certificate of Compliance ............................................ 85 <br />1-06.4 Handling and Storing Materials ............................................................ 85 <br />1-06.6 Recycled Materials .............................................................................. 85 <br />1-07 LEGAL RELATIONS AND RESPONSIBILITIES TO THE PUBLIC .......................... 86 <br />1-07.1 Laws to be Observed ........................................................................... 86 <br />1-07.2 State Taxes .......................................................................................... 87 <br />1-07.2 State Sales Tax.................................................................................... 87 <br />1-07.3 Fire Prevention and Merchantable Timber Requirements .................... 88 <br />1-07.5 Environmental Regulations .................................................................. 89 <br />1-07.6 Permits and Licenses .......................................................................... 89 <br />1-07.9 Wages ................................................................................................. 89 <br />1-07.11 Requirements for Nondiscrimination .................................................... 91 <br />1-07.14 Responsibility for Damage ................................................................... 92 <br />1-07.15 Temporary Water Pollution Prevention ................................................. 94
The URL can be used to link to this page
Your browser does not support the video tag.