Laserfiche WebLink
; SFM FRAMESYSTEM BONDING &_ GROUNDING 19�^ EN <br />■■ � SUN ��„ <br />800.377.4480 <br />M1403 N. Research Way <br />M MICRORAIL'" INSTALLATION GUIDE ; PA E• <br />Star Washer is <br />Single Use Only <br />TERMNALTORQUE, <br />Install Conductor and <br />torque to the followit <br />4-6 AWG 35in-lbs <br />8 AWG 25 in-lbs <br />10-14 AWG 20 in-lbs <br />TERMNALTORQUE, <br />Install Conductor and <br />torque to the following: <br />4-14 AWCr. 35in-lbs <br />WEEBLUG <br />Single Use Only <br />TERMNALTORQUE, <br />Install Conductor and <br />torque to the following: <br />6-14 AWG: 7ft-lbs <br />LUG DETAIL & TORQUE INFO LUG DETAIL & TORQUE INFO LUG DETAIL & TORQUE INFO <br />Ilsco Lay -In Lug (GBIJ4DBT) Ilsco Flange Lug (SGB-4) Wiley WEEBLug (6.7) <br />• 10-32 mounting hardware 0 1/4" mounting hardware 0 1/4" mounting hardware <br />• Torque = 5 ft-lb 0 Torque = 75 in -lb 9 Torque = 10 ft-lb <br />• AWG 4-14 - Solid or Stranded 9 AWG 4-14 - Solid or Stranded AWG 6-14 -Solid or Stranded <br />NOTE: ISOLATE COPPER FROM ALUMINUM CONTACT TO PREVENT CORROSION <br />System bonding is accomplished through modules. System grounding accomplished by attaching <br />a ground lug to any module at a location on the module specified by the module manufacturer. <br />E-W BONDING PATH: <br />E-W module to module bonding is accomplished <br />with 2 pre -installed bonding pins which engage <br />on the secure side of the MicrorailTM and splice. <br />N-S BONDING PATH: <br />N-S module to module bonding is <br />accomplished with bonding clamp with 2 integral <br />bonding pins. (refer also to alternate method) <br />Alternate method <br />TRfMRAIL BONDING PATH: <br />Trimrail to module bonding is accomplished with <br />bonding clamp with integral bonding pin and <br />bonding T-bolt. (refer also to alternate method) <br />CONFIDENTIAL- THE INFORMATION <br />HEREIN CONTAINED SHALL NOT BE <br />USED FOR THE BENEFIT OF ANYONE <br />EXCEPT BLUE RAVEN SOLAR NOR <br />SHALL IT BE DISCLOSED IN WHOLE OR <br />IN PART TO OTHERS OUTSIDE <br />RECIPIENTS ORGANIZATION, EXCEPT <br />IN CONNECTION WITH THE SALE AND <br />USE OF THE RESPECTIVE EQUIPMENT, <br />WITHOUT THE WRITTEN PERMISSION <br />OF BLUE RAVEN SOLAR LLC. <br />NABCEP <br />CERTIFIED <br />PV INSTALLATION <br />PROFESSIONAL <br />Scott Gurney <br />#PV-011719-015866 <br />CONTRACTOR: <br />BRS FIELD OPS <br />385-498-6700 <br />DRAWING BY: <br />PLOT DATE: <br />PROJECT NUMBER: <br />SPEC SHEET <br />REVISION: I PAGE NUMBER: <br />SS <br />