My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2308 TAYLOR DR 2023-12-08
>
Address Records
>
TAYLOR DR
>
2308
>
2308 TAYLOR DR 2023-12-08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/8/2023 1:27:00 PM
Creation date
10/20/2023 11:27:18 AM
Metadata
Fields
Template:
Address Document
Street Name
TAYLOR DR
Street Number
2308
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
VERETT <br />0 <br />Permit Inspections <br />City of Everett <br />3/22/2022 <br />3/22/2022 <br />PLUMB - SITE <br />JASON <br />I <br />NOT READY <br />READINESS CHECK <br />MORRISSEY <br />Notes: <br />jiayi.shen@hotmail.com <br />SITE READINESS CHECK <br />(3/22/2022 1:43 PM JJM) <br />- Expose all unapproved work (including electrical, mechanical, plumbing, and framing systems etc.) installed/altered without permits and inspection <br />approval. <br />PLUMB - SITE <br />4/21/2022 <br />4/21/2022 <br />READINESS <br />JASON <br />NOT READY <br />MORRISSEY <br />RECHECK <br />Notes: <br />jiayi.shen@hotmail.com <br />SITE READINESS CHECK <br />(4/21/2022 3:05 PM JJM) <br />Finish opening drywall from floor to ceiling behind upstairs shower for inspection of pex piping. <br />Have upstairs stack washer dryer removed for next site visit to access plumbing and elctrical. <br />Finish opening drywall to follow and expose all of the downstairs bathroom sink drain. <br />Finish opening drywall behind downstairs washing machine to expose plumbing. <br />5/23/2022 <br />5/23/2022 <br />PLUMB 08-FINAL <br />JASON <br />CANCELLED <br />NEEDS SRC <br />MORRISSEY <br />Notes: <br />5/20/2022 7:42 PM Jiayi Shen <br />Contact Name: Jiayi Shen <br />Site Address: 2308 TAYLOR DR <br />Phone:4255315919 <br />e-Mail: jiayi.shen@hotmail.com <br />PLUMB - SITE <br />5/24/2022 <br />5/24/2022 <br />READINESS <br />JASON <br />READY <br />MORRISSEY <br />RECHECK <br />Notes: <br />jiayi.shen@hotmail.com <br />5/24/2022 <br />5/24/2022 <br />PLUMB 03-ROUGH <br />JASON <br />APPROVAL <br />IN <br />MORRISSEY <br />Notes: <br />I <br />Printed: Friday, 20 October, 2023 2 of 3 rk <br />SUPERION <br />
The URL can be used to link to this page
Your browser does not support the video tag.