My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2308 TAYLOR DR 2023-12-08
>
Address Records
>
TAYLOR DR
>
2308
>
2308 TAYLOR DR 2023-12-08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/8/2023 1:27:00 PM
Creation date
10/20/2023 11:27:18 AM
Metadata
Fields
Template:
Address Document
Street Name
TAYLOR DR
Street Number
2308
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
current code should be provided per Table R402.1.1. Attics should be provided with ventilation baffles <br />per Section R402.2.3. <br />14. The project includes replacement of the existing windows and exterior doors. The required thermal <br />ratings for each type of vertical fenestration should be specified. See WSEC Table R402.1.1. <br />15. The project involves increasing the conditioned space at the upper floor. Energy credits are required <br />per WSEC Section R406. The required number of credits should be normalized per Table R406.2. A <br />schedule of the selected credits should be included in the drawings. The performance requirements <br />for the selected credits should be specified. <br />16. The bathrooms and kitchen should specify exhaust fans including the minimum required performance <br />rates per IRC Table M1505.4.4(1). <br />17. The house is required to have a heating system per IRC Section R303.9. The type and location of the <br />system should be specified. If the system is new, it should be indicated as such in the drawings. Gas <br />appliances are prohibited in the locations specified in Section G2406. <br />18. The house is required to have a water heating system per IRC Section R306.4. The type and location of <br />the system should be specified. If the system is new, it should be indicated as such in the <br />drawings. Seismic restraints should be provided per Section M1307.2. Gas appliances are prohibited in <br />the locations specified in Section G2406. <br />Structural: <br />19. The proposed project may include structural work. Structural drawings should be submitted as needed <br />that include framing plans, sections, details, construction schedules, fastening schedules, materials <br />requirements, general notes, special inspection requirements, etc. The drawings should substantiate <br />compliance with the prescriptive requirements of the IRC. See IRC Sections R106.1.1 and R301.1. <br />20. The project may involve structural modifications that do not comply with the prescriptive limitations of <br />the IRC. Where a structural design is performed per Section R301.1.3, structural drawings and <br />calculations should be prepared by a professional engineer licensed in the state of Washington; the <br />drawings and calculations should bear the seal and signature of the engineer. See RCW Sections <br />18.43.010, 18.43.020, and 18.43.070. <br />21. Details for the construction of the new walls should be included. The details should specify <br />connections for the top and bottom framing plates to the existing structure. See IRC Sections R106.1.1 <br />and R301.1. <br />22. A fastener schedule should be provided per IRC Table R602.3(1). Providing a reference to this table in <br />the drawings does not satisfy this requirement. In addition, the make and model of proprietary <br />hardware should be specified in the plans and details where used for connections. <br />Review of your project will be performed in the order received once the required documentation has been <br />submitted. Please let me know if you have questions. <br />
The URL can be used to link to this page
Your browser does not support the video tag.