Laserfiche WebLink
GEOTECHNICAL ENGINEERING • ENVIRONMENTAL ENGINEERING <br />CONSTRUCTION TESTING & INSPECTION <br />January 3, 2022 KANo. 096-21605 <br />Ms. Becky Barker (E-Maiq <br />PQT CONSTRUCTION <br />P.O. Box 1601 <br />Woodinville, WA 98072 <br />RE: CONSTRUCTION TESTING AND INSPECTION <br />Atal-Barrio <br />2610 Hillside Lana <br />Everett, Washington <br />Dear Ms. Barker, <br />In accordance with your request and authorization, our firm performed construction testing and inspection <br />for the above -referenced Project. The sampling and testing was performed by our inspectors and reports <br />are included. <br />If you have any questions, or if we can be of further assistance, plarm do not hesitate to contact our <br />office. <br />Respectfully submitted, <br />�1COCIATES, INC. <br />Corbett W. Merder� <br />Project Manager1ab Manager <br />Pack Northwest Division <br />CWMdkj <br />4303IRV Street SW, Lynnwood, Washington 98036 - (425) 485-5519 • FAX (425) 485-6837 <br />fVNh Q/Jtces Serving the Western UnitedS4aas <br />PNPIW5 A <br />