Laserfiche WebLink
1-Water Resistant Nylon Bag <br />3-Oil Absorbent Socks Yx 4' <br />2-Oil Absorbent Socks Xx 10' <br />12-Oil Absorbent Pads 17"x19" <br />1-Pair Splash Resistant Goggles <br />3-Pair Nitrile Gloves <br />10-Disposable Bags with Ties <br />Instructions <br />Maintenance Standards <br />. Secondary containment facilities shall be maintained free of accumulated rainwater and spills. <br />In the event of spills or leaks, accumulated rainwater and spills shall be collected and placed <br />into drums. These liquids shall be handled as hazardous waste unless testing determines <br />them to be non -hazardous. <br />. Re -stock spill kit materials as needed. <br />BMP C154: Concrete Washout Area <br />Purpose <br />Prevent or reduce the discharge of pollutants from concrete waste to stormwater by conducting <br />washout off -site, or performing on -site washout in a designated area. <br />Conditions of Use <br />Concrete washout areas are implemented on construction projects where: <br />. Concrete is used as a construction material <br />. It is not possible to dispose of all concrete wastewater and washout off -site (ready mix plant, <br />etc.). <br />. Concrete truck drums are washed on -site. <br />Note that auxiliary concrete truck components (e.g. chutes and hoses) and small concrete <br />handling equipment (e.g. hand tools, screeds, shovels, rakes, floats, trowels, and wheel- <br />barrows) may be washed into formed areas awaiting concrete pour. <br />At no time shall concrete be washed off into the footprint of an area where an infiltration feature will <br />be installed. <br />2019 Stormwater Management Manual for Western Washington <br />Volume 11 - Chapter 3 - Page 320 <br />