My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1710 W MARINE VIEW DR 2024-01-03
>
Address Records
>
W MARINE VIEW DR
>
1710
>
1710 W MARINE VIEW DR 2024-01-03
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2024 9:12:13 AM
Creation date
10/26/2023 3:14:28 PM
Metadata
Fields
Template:
Address Document
Street Name
W MARINE VIEW DR
Street Number
1710
Imported From Microfiche
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1335
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Design and Installation Specifications <br />Implementation <br />. Perform washout of concrete truck drums at an approved off -site location or in designated con- <br />crete washout areas only. <br />. Do not wash out concrete onto non -formed areas, or into storm drains, open ditches, streets, <br />or streams. <br />. Wash equipment difficult to move, such as concrete paving machines, in areas that do not dir- <br />ectly drain to natural or constructed stormwater conveyance or potential infiltration areas. <br />. Do not allow excess concrete to be dumped on -site, except in designated concrete washout <br />areas as allowed above. <br />• Concrete washout areas may be prefabricated concrete washout containers, or self -installed <br />structures (above -grade or below -grade). <br />. Prefabricated containers are most resistant to damage and protect against spills and leaks. <br />Companies may offer delivery service and provide regular maintenance and disposal of solid <br />and liquid waste. <br />. If self -installed concrete washout areas are used, below -grade structures are preferred over <br />above -grade structures because they are less prone to spills and leaks. <br />. Self -installed above -grade structures should only be used if excavation is not practical. <br />. Concrete washout areas shall be constructed and maintained in sufficient quantity and size to <br />contain all liquid and concrete waste generated by washout operations. <br />Education <br />. Discuss the concrete management techniques described in this BMP with the ready -mix con- <br />crete supplier before any deliveries are made. <br />. Educate employees and subcontractors on the concrete waste management techniques <br />described in this BMP. <br />. Arrange for the contractor's superintendent or Certified Erosion and Sediment Control Lead <br />(CESCL) to oversee and enforce concrete waste management procedures. <br />. A sign should be installed adjacent to each concrete washout area to inform concrete equip- <br />ment operators to utilize the proper facilities. <br />Contracts <br />Incorporate requirements for concrete waste management into concrete supplier and subcontractor <br />agreements. <br />2019 Stormwater Management Manual for Western Washington <br />Volume // - Chapter 3 - Page 321 <br />
The URL can be used to link to this page
Your browser does not support the video tag.