My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1710 W MARINE VIEW DR 2024-01-03
>
Address Records
>
W MARINE VIEW DR
>
1710
>
1710 W MARINE VIEW DR 2024-01-03
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2024 9:12:13 AM
Creation date
10/26/2023 3:14:28 PM
Metadata
Fields
Template:
Address Document
Street Name
W MARINE VIEW DR
Street Number
1710
Imported From Microfiche
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1335
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6 <br />Plans <br />C3.01 <br />How will drainage from the west be collected? It appears <br />Stormwater will be collected via the <br />CWC <br />that the new curbing will cut off the route to the existing <br />existing catch basins through the planned <br />catch basins. <br />2' wide curb cuts. Stormwater from the <br />Will runoff flow through the ADA curb cut? If so... that's not <br />existing asphalt will not flow through the <br />ideal, and the collected area should be included in the <br />ADA curb cut. <br />treatment unit sizing. <br />7 <br />Plans <br />C3.05 <br />CBs SD9 and SD7 have adverse changes in elevation. This <br />Adverse changes in elevation are <br />CWC <br />will cause the upstream pipes to be perpetually full of <br />unavoidable at SD9 without increasing the <br />water which will lead to increased maintenance costs and <br />pipe demolition outside of the project <br />plugging issues as sediment is likely to settle out in the <br />footprint significantly. The Port is <br />pipes. Is this necessary? Is the Port willing to take <br />responsible for maintaining this system. <br />responsibility for the additional maintenance burden? <br />The adverse change in elevation at SD7 is <br />Typically this configuration would not be acceptable. SD 9 <br />to allow for easier water, fire, electrical, <br />is especially concerning as it is below MHHW. <br />and comms construction. The Port is <br />responsible for maintaining this system. <br />8 <br />Operation <br />- <br />• Provide a cover sheet for the Operation and <br />Noted - 0&M Manual will include a cover <br />CWC <br />and <br />Maintenance Manual to make it a standalone document. <br />sheet <br />Maintenance <br />Manual <br />• Include owners and parties responsible for <br />Noted - Responsible parties include the <br />maintenance. <br />Port of Everett <br />Include maintenance requirements for all stormwater <br />Noted - Maintenance requirements for all <br />elements on the site, including CBs, pipes, etc. SWMM cut <br />catch basins and pipes will be included. <br />sheets are acceptable. <br />9 <br />Declaration <br />- <br />Provide a recorded copy of the Declaration of Covenant to <br />The Port will sign and record the <br />of Covenant <br />the City. This is required prior to Public Works Permit <br />covenant with the suggested edit. We <br />Issuance. We recommend removing "And Grant of <br />request issuing the permit prior to <br />Easement" from the title and footers, as we have found that <br />recording. We also request that the City <br />the County is requiring this form to be recorded twice. <br />work toward a more agreeable version of <br />this document for future projects. <br />Page 3 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.