Laserfiche WebLink
Element 2: Establish Construction Access (2.1.2) <br />Stabilized construction entrance shall be installed according to construction plans to minimize the <br />tracking of sediment off of the site. It shall be maintained until access is paved. Sediment tracked off site <br />shall be cleaned from the roadway daily. <br />List and describe BMPs: <br />BMP C105: Stabilized Construction Entrance/Exit <br />Installation Schedules: Installation prior to other construction activities. <br />Inspection and Maintenance plan: Inspection and maintenance shall be performed per BMP <br />Guidelines in the SWMMWW. <br />Responsible Staff: CESCL (TBD by Contractor) <br />