Laserfiche WebLink
Element 3: Control Flow Rates (2.1.3) <br />Runoff from the project site is discharged through an existing conveyance sytem to a flow <br />control exempt waterbody. The site is already highly developed and flow rates are not <br />anticipated to increase due to this project <br />Will you construct stormwater retention and/or detention facilities? <br />No <br />Will you use permanent infiltration ponds or other low impact development (example: rain <br />gardens, bio-retention, porous pavement) to control flow during construction? <br />No <br />List and describe BMPs: NA <br />Installation Schedules: NA <br />Inspection and Maintenance plan: NA <br />Responsible Staff: CESCL (TBD by Contractor) <br />