My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1712 W MARINE VIEW DR 2024-01-03
>
Address Records
>
W MARINE VIEW DR
>
1712
>
1712 W MARINE VIEW DR 2024-01-03
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2024 12:25:43 PM
Creation date
10/27/2023 7:17:41 AM
Metadata
Fields
Template:
Address Document
Street Name
W MARINE VIEW DR
Street Number
1712
Imported From Microfiche
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1464
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The comments below were generated from this project's City of Everett Stormwater Reviewers. All questions shall be routed through this project's Public <br />Works Reviewer with City of Everett Permit Services. <br /># <br />Document <br />Sht/Pg <br />Reviewer's Comment <br />Designer's Response <br />Initials <br />Review Comments from DEPARTMENT NAME. _Surface Water Management , REVIEWER NAME; _Erik Emerson <br />1 <br />SSP <br />Backwater <br />. Include a labels for the lettered pipes in the <br />Calculations <br />downstream map. <br />2 <br />SSP <br />MGS <br />What do the structures "outfall" and "Null" represent? <br />Calculations <br />These are large structures, but I'm not sure how they <br />impact the stormwater design. <br />3 <br />SSP <br />Is there any concern that very high tides/storm surge will <br />impact trees with salt water? Record high tide is well above <br />the outlet IE of the Filterra device. Include a backwater <br />valve or ensure (with note on plans) that the selected tree <br />species is tolerant of occasional saltwater inundation. <br />(Downstream analysis did not indicate a tidegate at outfall. <br />If there is one this comment can be ignored.) <br />4 <br />SSP <br />WQ sizing <br />Please connect the dots from design WQ flow rate to facility <br />sizing. I was not able to locate a description of the required <br />treatment footprint or facility capacity other than a <br />statement that the treatment vault flow rate is 0.069 CFS in <br />the text. There is no way to verify that the oil control <br />design rate was used, etc. A sizing letter from the <br />manufacturer is also acceptable as long as it states the <br />design assumptions. <br />5 <br />Plans <br />C3.01 <br />Existing CB in SE corner of site is noted to be raised to <br />grade and solid lid. Why not remove as this does not <br />appear to be junction or serve any purpose. <br />Page 2 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.