Laserfiche WebLink
Everett Parks Restroom Renovations <br />BCRA Project No. 23007.00.00 All Disciplines <br />ASR #1 – August 1, 2023 Page 2 of 9 <br />o 08 7400 Access Controls – by Client or access control consultant. <br />Deliverables: <br />· Progress reports <br />· 60% review set in PDF format and drawings in CAD format <br />· Permit Set in PDF format and drawings in CAD format <br />· Bid set in PDF format and drawings in CAD format <br /> <br />Phase 30 – Construction Documents <br />Task XS4 – Structural Engineering - Howarth Park, 1127 Olympic Blvd <br /> <br />PCS Structural Solutions will provide the following services for Structural Engineering for this phase: <br />1. Provide calculations and drawings to obtain a structural permit for a new single-story restroom that will <br />be 350 SF. <br />Meetings: <br />· 2 client meetings are anticipated. <br />· 1 design team coordination meeting. <br />Assumptions: <br />· Trash enclosures, lot lights, signage support, detention vaults, and other site structures are not <br />included but can be added as an additional service if requested. <br />Deliverables: <br />· Structural Schematic Design <br />· 60% Progress Set in PDF format <br />· Set for submission/re-submission to Plan Check <br /> <br /> <br />Phase 30 – Construction Documents <br />Task XM4 – MEP - Howarth Park, 1127 Olympic Blvd <br /> <br />Design West Engineering will provide the following services for Mechanical, Electrical and Plumbing <br />Engineering for this phase: <br />1. CSI Book format Mechanical, Plumbing and Electrical specifications <br />2. Completion of applicable governing agency comments (plan check comments) <br />3. Review of quantities and scope within contraction cost estimates provided by architect <br />4. Engineering calculations required to generate HVAC, plumbing and electrical design <br />5. Demolition plans <br />6. Mechanical plan(s) including the following: <br />a) Schedule of mechanical equipment <br />b) Locations of exhaust fans as required <br />7. Plumbing plan(s) including the following: <br />a) Schedule of plumbing fixtures <br />b) Complete plumbing system layout and sizing as required including domestic waste and vent, domestic <br />water (hot and cold) <br />c) Building utilities points of connection up to 5 feet outside of building