My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BCRA Inc 10/27/2023 Amendment 1
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
BCRA Inc 10/27/2023 Amendment 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/31/2023 10:49:18 AM
Creation date
10/31/2023 10:48:51 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
BCRA Inc
Approval Date
10/27/2023
Council Approval Date
10/11/2023
End Date
12/31/2026
Department
Parks
Department Project Manager
Lolly Huggins
Subject / Project Title
Parks Restrooms Renovation Project
Amendment/Change Order
Amendment
Amendment/Change Order Number
1
Tracking Number
0003723
Total Compensation
$240,000.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
Document Relationships
BCRA Inc. 5/11/2023
(Amendment)
Path:
\Documents\City Clerk\Contracts\Agreement\Professional Services (PSA)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Everett Parks Restroom Renovations <br />BCRA Project No. 23007.00.00 All Disciplines <br />ASR #1 – August 1, 2023 Page 3 of 9 <br />8. Lighting plan(s) including the following: <br />a) Schedule of lighting fixtures <br />b) Lighting layout and circuiting <br />c) Energy code lighting compliance forms <br />d) Lighting control wiring diagrams <br />9. Electrical power plan(s) including the following: <br />a) Coordination with existing electrical service and panelboards <br />b) Distribution and branch panel locations <br />c) Single line diagram <br />d) Load schedules <br />e) Panel schedules <br />f) Convenience receptable layout and circuiting <br />g) Voltage drop calculations <br />h) Electrical connections to low voltage devices as specified by other system designs <br />i) HVAC and plumbing equipment power connections specified by Mechanical Engineer <br />10. Signal plan(s) including the following: <br />a) Coordination with low voltage designer or vendor for pathways, power requirements and device <br />locations only for access control and security systems as required <br />11. Dry Utility Coordination will occur for this portion of the project. <br />Meetings: <br />·2 client meetings are anticipated. <br />·1 design team coordination meeting. <br />Deliverables: <br />·Progress set: 60% progress set in PDF format <br />·Set for submission/re-submission to Plan Check <br />Phase 30 – Construction Documents <br />Task XCE4 – Cost Estimation - Howarth Park, 1127 Olympic Blvd <br />Bill Acker will provide cost estimating services of the 60% progress set and the final bid set for the new field <br />constructed restroom of just over 300 SF and limited site development work required to accommodate it. <br />Deliverables: <br />·60% design estimate and review <br />·Bid set cost estimate & review <br />Phase 40 – Permitting <br />Task A4 – Architecture - Howarth Park, 1127 Olympic Blvd <br />Architect to submit permit package(s) to the City of Everett. The following activities will be performed:
The URL can be used to link to this page
Your browser does not support the video tag.