My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
920 MILLWRIGHT LOOP S BASE FILE 2023-12-29
>
Address Records
>
MILLWRIGHT LOOP S
>
920
>
BASE FILE
>
920 MILLWRIGHT LOOP S BASE FILE 2023-12-29
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/29/2023 3:28:33 PM
Creation date
10/31/2023 1:20:51 PM
Metadata
Fields
Template:
Address Document
Street Name
MILLWRIGHT LOOP S
Street Number
920
Tenant Name
BASE FILE
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
535
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The comments below were generated from this project's City of Everett Civil Reviewers. All questions shall be routed through this project's Public Works <br />Reviewer Abiy Tsegaye with City of Everett Permit Services (ATsegaye@everettwa.gov). <br /># <br />Document <br />Sht/Pg <br />Reviewer's Comment <br />Designer's Response <br />Initials <br />is complete, at which time a concrete <br />pathway will be installed here when the <br />road is finalized to match/meet final grades <br />and layout. <br />4 <br />Civil Plans <br />C3.01 <br />Include required standard drainage notes available in DCSS <br />Noted, sheet C3.03 has been added to <br />CWC <br />Volume I, Section 4-2.7. <br />include these notes. <br />UTILITY <br />PLAN/STORM <br />(19 of 85) <br />CWC <br />5 <br />Civil Plans <br />C3.01 <br />Include required standard water notes available in DCSS <br />Noted, plans revised to include comment. <br />Volume I, Section 5-2.1. <br />UTILITY <br />PLAN/WATER <br />Water meters to be moved to ROW line (EMC 14.16.190). <br />Per verbal and email correspondence with <br />Three 1" meters are shown on the plans. Please clarify the use <br />Abiy, the water meters can remain in their <br />(19 of 85) <br />of the meters. <br />location as they are submeters for the Port. <br />Please note on the plans." New water connections to be <br />The water service and meters shown are <br />performed by COE Water Dept Crews under separate Utility <br />permit based on a cost estimate prepared by the Water Dept <br />part of the existing Port of Everett's private <br />and paid for by the owner/contractor." <br />central marina potable water system. This <br />system originates from a 4-inch City water <br />meter located at the NE corner of the <br />project site and was installed/upgraded <br />during the SEMWL project. The proposed <br />meters are intended to submeter Port <br />tenant water uses. <br />Noted, plans revised to include comment. <br />6 <br />Civil Plans <br />C3.01 <br />Include required standard sanitary sewer notes available in <br />Noted, plans revised to include comment <br />CWC <br />DCSS Volume I, Section 6-3.1. <br />Noted, the existing side sewer slope has <br />UTILITY <br />PLAN/SEWER <br />Indicate side sewer slope. <br />been indicated on C3.01. The plumbing <br />Install CO at property line and outside building per COE 601. <br />sheets have also been attached to reference <br />(19 of 85) <br />Sewer connection per COE 602. <br />the lift station design and location in the <br />building. A private manhole structure has <br />been included at the end of the existing side <br />Page 3 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.