My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
920 MILLWRIGHT LOOP S BASE FILE 2023-12-29
>
Address Records
>
MILLWRIGHT LOOP S
>
920
>
BASE FILE
>
920 MILLWRIGHT LOOP S BASE FILE 2023-12-29
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/29/2023 3:28:33 PM
Creation date
10/31/2023 1:20:51 PM
Metadata
Fields
Template:
Address Document
Street Name
MILLWRIGHT LOOP S
Street Number
920
Tenant Name
BASE FILE
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
535
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The comments below were generated from this project's City of Everett Stormwater Reviewers. All questions shall be routed through this project's Public <br />Works Reviewer. <br /># <br />Document <br />Sht/Pg <br />Reviewer's Comment <br />Designer's Response <br />Initials <br />Review Comments from DEPARTMENT NAME: _Surface Water Management , REVIEWER NAME: Erik Emerson <br />1 <br />SSP <br />The 2017 Hydrologic and Hydraulic report (HH Report) <br />documented the overall site facilities design, including the core <br />conveyance system. However, the HH Report did not fully <br />address the determination of applicable standards or how all of <br />the minimum requirements would be addressed. Moreover, the <br />City has adopted the 2019 Stormwater Management Manual <br />while the HH Report was designed under the 2014 manual. Each <br />new application must comply with the stormwater requirements <br />in effect at the time of application. The stormwater site plan <br />(SSP) for each new application must include a determination of <br />applicable requirements and a summary of how each minimum <br />requirement (MR) is addressed for the project. It's totally <br />acceptable to reference back to the HH Report for the MR's that <br />apply, but the documentation needs to be provided in each new <br />SSP. In addition, most projects will require a site -specific <br />backwater analysis for the onsite conveyance system design. <br />Since this project does not add any new conveyance the analysis <br />is not needed. <br />2 <br />SSP <br />The 2019 Stormwater Management Manual includes <br />substantially more source control BMPs and requirements than <br />previous manuals. Please review the requirements for MR3 and <br />address any necessary source control measures based on the <br />anticipated use for the site. <br />3 <br />SSP <br />The project design appears consistent with the assumptions of <br />the HH Report. No additional water quality treatment or <br />conveyance design are needed. <br />Page 4 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.