Laserfiche WebLink
The comments below were generated from this project's City of Everett Stormwater Reviewers. All questions shall be routed through this project's Public <br />Works Reviewer. <br /># <br />Document <br />Sht/Pg <br />Reviewer's Comment <br />Designer's Response <br />Initials <br />Review Comments from DEPARTMENT NAME: _Surface Water Management , REVIEWER NAME: Erik Emerson <br />1 <br />SSP <br />The 2017 Hydrologic and Hydraulic report (HH Report) <br />documented the overall site facilities design, including the core <br />conveyance system. However, the HH Report did not fully <br />address the determination of applicable standards or how all of <br />the minimum requirements would be addressed. Moreover, the <br />City has adopted the 2019 Stormwater Management Manual <br />while the HH Report was designed under the 2014 manual. Each <br />new application must comply with the stormwater requirements <br />in effect at the time of application. The stormwater site plan <br />(SSP) for each new application must include a determination of <br />applicable requirements and a summary of how each minimum <br />requirement (MR) is addressed for the project. It's totally <br />acceptable to reference back to the HH Report for the MR's that <br />apply, but the documentation needs to be provided in each new <br />SSP. In addition, most projects will require a site -specific <br />backwater analysis for the onsite conveyance system design. <br />Since this project does not add any new conveyance the analysis <br />is not needed. <br />2 <br />SSP <br />The 2019 Stormwater Management Manual includes <br />substantially more source control BMPs and requirements than <br />previous manuals. Please review the requirements for MR3 and <br />address any necessary source control measures based on the <br />anticipated use for the site. <br />3 <br />SSP <br />The project design appears consistent with the assumptions of <br />the HH Report. No additional water quality treatment or <br />conveyance design are needed. <br />Page 4 of 5 <br />