Laserfiche WebLink
WATERFRONT PLACE CENTRAL A17 PROJECT SITE —HH SUMMARY <br />PORT OF EVERETT—PM 1-20154lOS PND No. 154016-021.02 <br />4. PARCEL A17 COMPLIANCE WITH 2O19 SWMMW W MINIMUM REQUIREMENTS <br />4.1. MINIMUM REQUIREMENT#1- STORMWATER SITE PLAN PREPARATION <br />This stomawater report and plan have been prepared in accordance with Volume 1, Chapter 3 of the <br />2019 SWMMW W. <br />4.2. MINIMUM REQUIREMENT #2— CONSTRUCTION STORMWATER POLLUTION <br />PREVENTION <br />The project contractor shall prepare and submit a C-SWPPP as indicated in report section 4 of this <br />report. <br />43. MINIMUM REQUIREMENT 43 — SOURCE CONTROL OF POLLUTION <br />Per section 5 of the W mSmnt Plue Causal (WPC) Pbate 2 and 3—Hydrologu a d Hydnzw& Report (2017 — <br />POE HIT Report) and as amended here: <br />43.1. TEMPORARY EROSION AND SEDIMENT CONTROL <br />BMP C105 — Stabilized Construction Access <br />BMP C107 — Construction Road/Puking Area Stabilization <br />• All construction p king and laydown ue s ue situated on exisdng stabilized gravel <br />areas designated for construction use. <br />BMP C120—Temporary and Permanent Seeding <br />• All exposed areas not receiving permanent landscaping ground cover vvJl be <br />hydroseeded. <br />BMP C123— Plastic Covering <br />• NI stockpiled materials and branches will be covered per this BMP as indicated in <br />the project specifications. <br />BMP C140—Dust Comml <br />BMP C150—Materials on Hand <br />BMP Cl51— Concrete Handling <br />BMP C152— Saw -cutting and Surface Pollution Prevention <br />BMP C153—Material Delivery, Storage and Contacanmmt <br />BMP C160— Certified Erosion and Sediment Control Lead <br />BMP C162— Scheduling <br />BMP C220— Ida Protection <br />BMP C233— SJt Fence <br />4.3.2. PERMANENT EROSION AND SEDIMENT CONTROL <br />All stormwatu systems will be dosed conveyances. Srortnwater treatment vaults, catch basin and <br />manhole sumps will be designed to trap sediment and mininme sediments entering the Snohomish River. <br />ran U <br />