Laserfiche WebLink
71. For all filling activities identified in 7h, describe the source and nature of the fill material, the amount in <br />cable yards that will be used, and how and where it will be placed into the wetland`.[hd_e7 <br />N/A <br />7]. For all excavating activities identified in 7h, describe the excavation method type and amount of material in <br />(cubic yards you will remove, and where the material will be disposed. Lela] <br />N/A <br />Part 8—Waterbodles (other than wetlands): Impacts and Mitigation <br />In Pad 8, "waterbodies" refers to non -wetland waterbodies. (See Part 7 for information related to wetlands.) rus <br />❑ Check here ff there are waterbodies on or adjacent to the project area. (If there are none, skip to Part 9.) <br />8a. Describe how the Project is designed to avoid and minimize adverse Impacts to the aquatic environment... <br />laadw <br />❑ Not applicable <br />The project will use porous pavement within 200 feet of the OHWM of Silver Lake to increase infiltration and <br />decrease runoff into the lake. The trail will be graded to dived runoff from the sand volleyball court and asphalt <br />road from entering directly into Silver Lake <br />811b. Will your project. impact a waterbody or the area around a waterbody7 them <br />❑Yes ®No <br />ORIA-mvlead M020 Page a d U <br />