Laserfiche WebLink
So. Have you prepared a mitigation plan to compensate for the project's adverse impacts to non -wetland <br />Waterbodles7.thd J <br />• If Yes submit he plan wth the JARPA peonage and answer8tl <br />It Na or Not applicable explain amass why a mdgahon plan should not be required <br />❑ Yes ® No ❑ Don't know <br />No impact to Silver Lake is anticipated. <br />8d. Summarize what the mitigation plan is meant to accomplish Describe how a watershed approach was <br />used to design the plan <br />if you already completed Pg you do not need to restate your answer here. [here <br />WA <br />8e, Summarize impact(s) to each waterbody in the table below. IVLIW <br />Activity (clear, <br />Waterbody <br />Impact <br />Duration <br />Amount of material <br />Area (sq. ft. or <br />dredge, fill, pile <br />name' <br />location' <br />of Impacts <br />(cubic yards) to be <br />linear ft.) of <br />drive, etc.) <br />placed in or removed <br />waterbody <br />from waterbody <br />directly affected <br />N/A <br />It no omad name ter the wabutudy uses, creaks a unique rune teach as-sbeem i]The name should he measured MN other dcaumenb <br />Indicate tewMlherthe impact Ail was In or adisind b the westerly, if edlacent,proMathe tlMeope baNreen the Import and are masses and <br />indicate "ether he Impactwltlmnarampin Me 100-yeerllood plain. <br />alndflode the d a months or ""the dubW wInse measma mosib the work. Enter a anent"ila licabk. <br />8f. For all activities Identified in tie describe the source and nature of the fill material, amount (In cubic yards) <br />you will use, and how and where it will be placed into the waterbody. ba <br />N/A <br />oRIA..m.ae aa]e]a Pacesaia <br />