Laserfiche WebLink
CITY OF EVERETT <br />EVERETT Permit Services <br />WASHINGTON <br />MEMORANDUM <br />TO: Dean Shaughnessy I City of Everett, (425) 328-4594 <br />FROM: Thad Newport I City of Everett Engineering/Permit Services, TNewport@everettwa.gov <br />DATE: 06/11/2022 <br />SUBJECT: Plan Review Comments for Public Works Permit Application <br />PROPOSAL: Site Work for Silver Lake Trail Project <br />LOCATION: 11807 Silver Lake DR <br />PERMIT #: PW2204-028 <br />A review of this project by the Engineering/Permit Services Division indicates that the following revisions should be made and/or the following conditions <br />must be met: <br />Please see the compiled list of comments below to revise your plans accordingly, prior to resubmitting to Permit Services. Please respond to comments in <br />the table's response column provided. If you have any questions regarding the comments or need anything further, please directly contact this project's <br />Public Works reviewer, Thad Newport, at TNewport@everettwa.gov. Please note that these comments are compiled from Public Works reviewers for the <br />Public Works (civil) plans only. The applicant team may receive a separate comment letter from the Planning Reviewer for comments related to this <br />construction permit or the associated ongoing Land Use review, or from the Building Reviewer for architectural, structural, or other types of drawings. <br />Resubmittal: Please send your electronic resubmittal to TNewport@everettwa.gov (email with a downloadable link to the electronic files). For more <br />instructions, see our permit application submittal & re -submittal Instructions (PDF). Lobby hours are Monday through Friday from 7:30am — 3:00pm. <br />Required resubmittal items are as outlined below: <br />i. Transmittal Sheet: (1) available at the Permit Services Lobby or online here: Transmittal sheet (PDF) for your use upon resubmittal. <br />ii. Plans: Revised Civil Plans- latest civil design responding to these comments plus land use conditions. <br />iii. Drainage Report: Revised Drainage Report <br />