My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11807 SILVER LAKE DR 2024-01-05
>
Address Records
>
SILVER LAKE DR
>
11807
>
11807 SILVER LAKE DR 2024-01-05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/5/2024 8:32:22 AM
Creation date
11/1/2023 1:06:10 PM
Metadata
Fields
Template:
Address Document
Street Name
SILVER LAKE DR
Street Number
11807
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
684
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT <br />EVERETT Permit Services <br />WASHINGTON <br />MEMORANDUM <br />TO: Dean Shaughnessy I City of Everett, (425) 328-4594 <br />FROM: Thad Newport I City of Everett Engineering/Permit Services, TNewport@everettwa.gov <br />DATE: 06/11/2022 <br />SUBJECT: Plan Review Comments for Public Works Permit Application <br />PROPOSAL: Site Work for Silver Lake Trail Project <br />LOCATION: 11807 Silver Lake DR <br />PERMIT #: PW2204-028 <br />A review of this project by the Engineering/Permit Services Division indicates that the following revisions should be made and/or the following conditions <br />must be met: <br />Please see the compiled list of comments below to revise your plans accordingly, prior to resubmitting to Permit Services. Please respond to comments in <br />the table's response column provided. If you have any questions regarding the comments or need anything further, please directly contact this project's <br />Public Works reviewer, Thad Newport, at TNewport@everettwa.gov. Please note that these comments are compiled from Public Works reviewers for the <br />Public Works (civil) plans only. The applicant team may receive a separate comment letter from the Planning Reviewer for comments related to this <br />construction permit or the associated ongoing Land Use review, or from the Building Reviewer for architectural, structural, or other types of drawings. <br />Resubmittal: Please send your electronic resubmittal to TNewport@everettwa.gov (email with a downloadable link to the electronic files). For more <br />instructions, see our permit application submittal & re -submittal Instructions (PDF). Lobby hours are Monday through Friday from 7:30am — 3:00pm. <br />Required resubmittal items are as outlined below: <br />i. Transmittal Sheet: (1) available at the Permit Services Lobby or online here: Transmittal sheet (PDF) for your use upon resubmittal. <br />ii. Plans: Revised Civil Plans- latest civil design responding to these comments plus land use conditions. <br />iii. Drainage Report: Revised Drainage Report <br />
The URL can be used to link to this page
Your browser does not support the video tag.