Laserfiche WebLink
The comments below were generated from this project's Stormwater Reviewers. All questions shall be routed through this project's Public Works Reviewer <br />Thad Newport with City of Everett Permit Services (TNewport@everettwa.gov). <br /># <br />Document <br />Sht/Pg <br />Reviewer's Comment <br />Designer's Response <br />Initials <br />1 <br />Geotechnical <br />- <br />TP-7 from the geotech report indicates groundwater at 18 in. <br />Response from PERTEET: The city will have <br />Report <br />below grade. It appears that TP-7 is near the proposed <br />to raise the trail 4 inches to achieve 12 <br />permeable pavement on the south end of the trail. BMP T5.15 <br />inches of separation: Ecology's minimums: 4 <br />requires a 1 ft separation to groundwater. <br />inch porous pavement (raised), 6 inch <br />ballast storage layer, 12 inch separation <br />(ecology detail below) <br />Ok — Update plans. <br />Page 2 of 4 <br />