My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11807 SILVER LAKE DR 2024-01-05
>
Address Records
>
SILVER LAKE DR
>
11807
>
11807 SILVER LAKE DR 2024-01-05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/5/2024 8:32:22 AM
Creation date
11/1/2023 1:06:10 PM
Metadata
Fields
Template:
Address Document
Street Name
SILVER LAKE DR
Street Number
11807
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
684
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
d. Proposed measures to preserve or enhance wildlife, if any: <br />None. <br />e. List any invasive animal species known to be on or near the site. <br />None known. <br />6. Energy and Natural Resources hj esj <br />a. What kinds of energy (electric, natural gas, oil, wood stove, solar) will be used to meet <br />the completed project's energy needs? Describe whether it will be used for heating, <br />manufacturing, etc. <br />None. <br />b. Would your project affect the potential use of solar energy by adjacent properties? <br />If so, generally describe. <br />No. <br />c. What kinds of energy conservation features are included in the plans of this proposal? <br />List other proposed measures to reduce or control energy impacts, if any: <br />None. <br />7. Environmental Health hj ell j <br />a. Are there any environmental health hazards, including exposure to toxic chemicals, disk <br />of fire and explosion, spill, or hazardous waste, that could occur as a result of this proposal?If <br />so, describe. <br />No. <br />1) Describe any known or possible contamination at the site from present or past uses. <br />None known. <br />2) Describe existing hazardous chemicalsltzendilions that might affect project development <br />and design. This includes underground hazardous liquid and gas transmission pipelines <br />located within the project area and in the vicinity. <br />A review of the Washington Department of Ecology cleanup sites database revealed 5 <br />sites within one4alf mile from the project location. No bazmat sites are mapped to occur <br />in the project location. Any potentially contaminated soils encountered during <br />construction will be prof cal and disposed of according to the Model Taxies Control Act <br />(MCTA). <br />3) Describe any toxic or hazardous chemicals that might be stored, used, or produced <br />during the project's development or construction, or at any time during the operating <br />life of the project. <br />No toxic or hazardous chemicals will be stored or produced during the project's <br />development or constructiono at at any time during the operating life of the project The <br />only hazardous chemicals that will be used (luting the project are lubricants and fuels <br />associated with equipment that will be used during project construction. Best <br />management practices (BMPs) will be implemented to minimize the potential for fuello6 <br />spills during project construction. <br />eaPA EmomnmmWlcN,mot twxa tW-01AMI JU12010 Pace 7 of 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.