Laserfiche WebLink
4) Describe special emergency services that might be required. <br />None. <br />5) Proposed measures to reduce or control environmental health hazards, IF any: <br />Spill kits will be required to be maintained in construction vehicles on site during <br />construction and a SPCC (Spill Prevention, Control, and Countermeasure) plan will be <br />required and implemented for the project action. The City of Everett Spill Hotline will also <br />be active of (425) 257-8821 for M7 spill reporting. <br />b. Noise <br />1) What types of noise exist in the area which may affect your project (for example: <br />traffic, equipment, operation, other)? <br />None. Traffic noise occurs on Silver Lake Road. <br />2) What types and levels of noise would be created by or associated with the project on a <br />shod -term or a long-term basis (for example: traffic, construction, operation, other)? Indi- <br />cate what hours noise would come from the site. <br />Construction noise is anticipated on a short-term basis within the hours allowed by the City of <br />Everett noise ordinance. <br />3) Proposed measures to reduce or control noise impacts, if any: <br />None. <br />8. Land and Shoreline Use hj�j <br />a. What is the current use of the site and adjacent properties? Will the proposal affect current <br />land uses on nearby or adjacent properties? If no describe. <br />The current land use of the trail anticancer is park properly and public right of way. The <br />current use of adjacent properties are single famgy homes. <br />b. Has the project site been used as working farmlands or working forest lands? If so, describe. <br />How much agricultural or forest land of long-term commercial significance will be converted to <br />other uses as a result of the proposal, if any? If resource lands have not been designated, <br />how many acres in farmland or forest land lax status will be converted to nonfarm or <br />nonforest use? <br />No. <br />1) Will the proposal affect or be affected by surrounding working farm or forest land normal <br />business operations, such as oversize equipment access, the application of pesticides, <br />tilling, and harvesting? If so, how: <br />No. <br />c. Describe any structures on the site. <br />The project site contains 14 structures including restrooms, picnic shelters, and buildings <br />associated with Camp Patterson. <br />saraamemomema CheGkTM avne 191-11.101 +dfIDw Page 8 d to <br />