Laserfiche WebLink
JULY2022 I STORMWATER SITE PLAN <br />10 PERTEET <br />2.0 EXISTING CONDITION <br />The proposed project limits are approximately located along the existing Silver Lake Trail from 118th Place <br />SE/Sill Lake Drive to Silver Lake Roaj lbberson Drive. See the Vicinity map, above, and the plans submitted <br />under separate cover. <br />Within the proposed project limits, Silver Lake Trail generally consists of gravel paths, asphalt pavement, native <br />bare soil, grass, and topsoil paths. Much of the paved surfaces appear to be in relatively fair condition with <br />localized root related distresses. Slopes vary but generally transitions from rolling to flat as the project limits <br />approach Silver Lake. <br />Perched water and dead/dying grass adjacent o the project limits indicates poorly drained soils. Signs of erosion, <br />sedimentation, and channelization were observed throughout the project. See Section 4.2 for photo <br />documentation. <br />There is no known stormwater system within the project limits nor adjacent to the project. <br />Sullivan Park consists of a significant amount of impervious area and is substantially developed. The existing land <br />cover was neither mapped nor quantified. This project is considered as redevelopment and by method of <br />inspection this project does not add more than 50%of the existing impervious area. <br />