Laserfiche WebLink
City of Everett 01 1100 - 5 <br />2024 WPCF Biosolids Removal UT 3826-2 <br /> <br /> <br />00 1100 - 5 SUMMARY OF WORK <br /> <br />1.8 BIOSOLIDS WEIGHING AND TRANSPORTATION <br /> <br />A. Transportation Equipment <br /> <br />1. The Contractor shall provide all labor, equipment, and appurtenances <br />necessary to perform and support the loading, transportation, and <br />placement of the biosolids to the dewatering operations staging area. <br />2. Trucks shall be thoroughly cleaned after dumping the material with minimal <br />solids left in the truck from the previous load. It shall be the Contractor’s <br />responsibility to clean up any biosolids on a daily basis that are deposited <br />on the Pad between the dewatering staging area, the storage area, and the <br />scale. <br /> <br />B. Safety & Spills <br /> <br />1. Drivers must have current licenses for the vehicles they operate and <br />suitable for the material hauled. <br />2. Any spillage of biosolids, fuel, or any debris or materials associated with the <br />Contractor’s activities or operations must be reported to the City’s Project <br />Manager as soon as possible. <br />3. The Contractor shall clean up any spills immediately per the Contractor’s <br />Spill Prevention Plan in a manner approved of by the City’s Project Manager. <br />Spill response and cleanup shall be at the Contractor’s expense. See <br />Section 01 5000 Temporary and Environmental Controls, 1.10 Spill <br />Prevention. <br /> <br />C. WPCF Truck Scale <br /> <br />1. The City will provide a certified truck scale on the Biosolids Pad for the <br />Contractor to use. The scale will be used to weigh loads as they are moved <br />to the storage area on the City’s Biosolids Pad. <br />2. Each truck will be weighed before and after loading biosolids to accurately <br />calculate the weight of biosolids transported. This means that each truck <br />load will have two scale tickets, one from the empty condition and one from <br />full. Both tickets are required for payment. <br />3. Upon completion of the work, the Contractor will be responsible for <br />returning the truck scale to its original condition at the start of the project. <br />All damage to the truck scale will be the responsibility of the Contractor to <br />repair to the satisfaction of the City’s Project Manager. <br /> <br /> <br />1.9 ADDITIONS TO, OR DEDUCTIONS FROM, THE CONTRACT <br />