My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
American Process Group LLC 10/31/2023
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2024
>
American Process Group LLC 10/31/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2023 1:38:43 PM
Creation date
11/1/2023 1:30:25 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
American Process Group LLC
Approval Date
10/31/2023
Council Approval Date
11/1/2023
End Date
5/31/2024
Department
Public Works
Department Project Manager
Joseph Ferguson
Subject / Project Title
2024 WPCF Biosolids Removal
Public Works WO Number
UT 3826
Tracking Number
0004001
Total Compensation
$1,275,708.21
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
307
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
City of Everett 01 1100 - 6 <br />2024 WPCF Biosolids Removal UT 3826-2 <br /> <br /> <br />00 1100 - 6 SUMMARY OF WORK <br />A. The authorization of all Additions to, or Deductions from, labor and materials, as <br />called for in the Contract, shall be given only upon the Owner's printed change <br />order form bearing the signatures of the Owner, the Contractor, and the <br />Architect/Engineer. <br /> <br /> <br />1.10 CHANGES IN THE WORK <br /> <br />A. Change orders will be calculated based on the provisions in Section 00 7200. <br /> <br /> <br />1.11 WORK BY OTHERS <br /> <br />A. The Contractor is required to coordinate all their activities with the City’s Project <br />Manager, or their designee. The City may have other construction projects in <br />progress at the WPCF during the duration of this project and it is the Contractor’s <br />responsibility to assure that adequate notice is given to the City’s Project <br />Manager regarding equipment or materials that may need to be relocated in order <br />to perform the work. <br /> <br /> <br />1.12 WORK BY THE OWNER <br /> <br />A. The Owner shall have the right to access the site 24/7 and execute work not <br />included in this Contract and concurrent with the contract period. Contractor shall <br />cooperate with such Owner sponsored efforts. <br /> <br /> <br />B. Sample testing and analysis required by the Owner under terms of this Contract <br />will be conducted by appropriate City Staff under the supervision of Everett <br />Environmental Laboratory, which is co-located at the WPCF. All samples required <br />by City will be analyzed at City’s expense. <br /> <br /> <br />1.13 SOLIDS ANALYTICAL DATA <br /> <br />A. Biosolids data is provided in Appendix C. Data was taken in 2023 per the WPCF’s <br />NPDES permit from Washington State Department of Ecology. The biosolids <br />have been analyzed in-situ for pollutants in accordance with 40 CFR 503 as <br />required by coverage under the General Permit for Biosolids. Each prospective <br />bidder must determine what evaluations of the in-situ solids characteristics are <br />necessary and shall coordinate with the City’s Project Manager if additional solids <br />information is needed. Time is given at each pre-bid meeting for Contractors to <br />take additional sampling. It is the Contractor’s responsibility to determine how the
The URL can be used to link to this page
Your browser does not support the video tag.