Laserfiche WebLink
City of Everett 01 1100 - 6 <br />2024 WPCF Biosolids Removal UT 3826-2 <br /> <br /> <br />00 1100 - 6 SUMMARY OF WORK <br />A. The authorization of all Additions to, or Deductions from, labor and materials, as <br />called for in the Contract, shall be given only upon the Owner's printed change <br />order form bearing the signatures of the Owner, the Contractor, and the <br />Architect/Engineer. <br /> <br /> <br />1.10 CHANGES IN THE WORK <br /> <br />A. Change orders will be calculated based on the provisions in Section 00 7200. <br /> <br /> <br />1.11 WORK BY OTHERS <br /> <br />A. The Contractor is required to coordinate all their activities with the City’s Project <br />Manager, or their designee. The City may have other construction projects in <br />progress at the WPCF during the duration of this project and it is the Contractor’s <br />responsibility to assure that adequate notice is given to the City’s Project <br />Manager regarding equipment or materials that may need to be relocated in order <br />to perform the work. <br /> <br /> <br />1.12 WORK BY THE OWNER <br /> <br />A. The Owner shall have the right to access the site 24/7 and execute work not <br />included in this Contract and concurrent with the contract period. Contractor shall <br />cooperate with such Owner sponsored efforts. <br /> <br /> <br />B. Sample testing and analysis required by the Owner under terms of this Contract <br />will be conducted by appropriate City Staff under the supervision of Everett <br />Environmental Laboratory, which is co-located at the WPCF. All samples required <br />by City will be analyzed at City’s expense. <br /> <br /> <br />1.13 SOLIDS ANALYTICAL DATA <br /> <br />A. Biosolids data is provided in Appendix C. Data was taken in 2023 per the WPCF’s <br />NPDES permit from Washington State Department of Ecology. The biosolids <br />have been analyzed in-situ for pollutants in accordance with 40 CFR 503 as <br />required by coverage under the General Permit for Biosolids. Each prospective <br />bidder must determine what evaluations of the in-situ solids characteristics are <br />necessary and shall coordinate with the City’s Project Manager if additional solids <br />information is needed. Time is given at each pre-bid meeting for Contractors to <br />take additional sampling. It is the Contractor’s responsibility to determine how the