My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
American Process Group LLC 10/31/2023
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2024
>
American Process Group LLC 10/31/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2023 1:38:43 PM
Creation date
11/1/2023 1:30:25 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
American Process Group LLC
Approval Date
10/31/2023
Council Approval Date
11/1/2023
End Date
5/31/2024
Department
Public Works
Department Project Manager
Joseph Ferguson
Subject / Project Title
2024 WPCF Biosolids Removal
Public Works WO Number
UT 3826
Tracking Number
0004001
Total Compensation
$1,275,708.21
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
307
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
City of Everett 01 1100 - 7 <br />2024 WPCF Biosolids Removal UT 3826-2 <br /> <br /> <br />00 1100 - 7 SUMMARY OF WORK <br />characteristics of the City’s biosolids may influence the performance and <br />efficiency of their equipment. Solids concentration will vary horizontally and <br />vertically within the City’s Aeration Cell #2. <br /> <br /> <br />1.14 CITY OF EVERETT BUSSINESS LICENSE <br /> <br />A. Contractor must obtain a City of Everett business license prior to performing any <br />Work pursuant to this Contract. <br /> <br /> <br />1.15 PERMITS <br /> <br />A. The Contractor shall be responsible to obtain and pay the cost of any applicable <br />permits and connection fees required to do the Work, and such costs shall be <br />included in the Bid. <br /> <br /> <br />1.16 CODES AND STANDARD SPECIFICATIONS <br /> <br />A. All construction shall be in accordance with the International Building Code, <br />Current Adopted Edition. <br /> <br />B. All construction shall be in accordance with the Uniform Mechanical Code, and <br />the Uniform Plumbing Code, latest editions. <br /> <br />C. All construction shall be in conformance with the WSDOT/APWA Standard <br />Specifications and Standard Plans, latest edition. <br /> <br />D. All construction shall be in conformance with the City of Everett Design and <br />Construction Standards and Specifications, latest edition. <br /> <br />E. All work shall comply with applicable requirements of Snohomish County. <br /> <br />F. Any material specified by reference to the number, symbol, or title of a specified <br />standards, such as Commercial Standard Federal Specifications, a trade <br />association standard, or other similar standard, shall comply with the <br />requirements of the latest revision thereof, and any amendment or supplement <br />thereto in effect on the date of Invitation for Bids, except as limited to type, class <br />or grade, or modified in such references. All work shall conform to the standard <br />referred to, except as modified in these specifications and the drawings. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.