My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
American Process Group LLC 10/31/2023
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2024
>
American Process Group LLC 10/31/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2023 1:38:43 PM
Creation date
11/1/2023 1:30:25 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
American Process Group LLC
Approval Date
10/31/2023
Council Approval Date
11/1/2023
End Date
5/31/2024
Department
Public Works
Department Project Manager
Joseph Ferguson
Subject / Project Title
2024 WPCF Biosolids Removal
Public Works WO Number
UT 3826
Tracking Number
0004001
Total Compensation
$1,275,708.21
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
307
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
City of Everett 00 2113 - 1 <br />2024 WPCF Biosolids Removal UT 3826-2 <br /> <br /> <br />00 2113 - 1 INSTRUCTIONS TO BIDDERS <br />SECTION 00 2113 INSTRUCTIONS TO BIDDERS <br />1-00 INTRODUCTORY MATTERS <br />General Description and Location of Project <br />The Work to be performed will include furnishing all labor, materials and equipment <br />necessary to perform all Work as required by the Contract in accordance with the Contract <br />Documents. <br /> <br />The Project is located at 4027 4th Street Southeast, Everett WA. See Appendix A. <br /> <br />Project Manager <br />Questions and inquiries about these Contract Documents should be directed in writing to <br />the attention of the Project Manager Joseph Ferguson at 425-257-6789 or email <br />JFerguson@everettwa.gov. <br /> <br />Standard Specifications <br />The following other Specifications and Standard Plans shall apply only to the extent that <br />they are called out in the Contract Documents. <br />• WSDOT “2021 Standard Specifications for Road, Bridge and Municipal <br />Construction”, hereinafter referred to as the “Standard Specifications.” <br />• City of Everett “Design and Construction Standards and Specifications” (Revised <br />January 2018), as found online on the City’s Website at: <br />https://everettwa.gov/1531/Design-Construction-Standards <br />• “Standard Plans for Road and Bridge Construction,” latest edition as prepared by <br />WSDOT. <br />• “Manual on Uniform Traffic Control Devices” (MUTCD), latest edition. <br />• APWA Standards, latest edition. <br />• AWWA Standards, latest edition. <br />• American Concrete Institute (ACI), latest edition <br />1-01 DEFINITIONS AND TERMS <br />1-01.1 Definitions <br />Definitions are found in SECTION 7200 GENERAL CONDITIONS. <br />1-02 BID PROCEDURES AND CONDITIONS <br />1-02.1 Bidder Responsibility Criteria <br />1-02.1(1) Mandatory Bidder Responsibility Criteria <br />Bidder shall meet mandatory responsibility criteria in accordance with RCW <br />39.04.350(1). The City may require Bidder to submit documentation <br />demonstrating compliance with the criteria under this 1-02.1(1). Bidder must: <br />1. Registration. Have a current certificate of registration as a contractor in <br />compliance with chapter 18.27 RCW, which must have been in effect at the <br />time of Bid submittal; and
The URL can be used to link to this page
Your browser does not support the video tag.