Laserfiche WebLink
Element 13. Protect low impact development: <br />❑ BMP C 102: BufferZones <br />❑ BMP C 103: High Visibility Plastic or Metal Fence <br />❑ BMP C200: Interceptor Dike and Swale <br />❑ BMP C207: Check Dams <br />❑ BMP C208: Triangular Silt Dike (Geotextile Encased Check Dam) <br />❑ BMP C231: Brush Barrier <br />❑ BMP C233 Silt Fence <br />❑ BMP C 234: Vegetated Strip <br />❑ Other Per the SWMMWW: <br />19 Not applicable to my proposed project <br />Explain: <br />Task 3: Construction SWPPP drawings <br />Provide a Temporary Erosion and Sediment Control (TESC) plan for your project. <br />■ Show on your TESC Plan all BMPs selected above to satisfy the 13 Elements on your <br />TESC Plan. <br />■ See City of Everett Public Works Standard Plan 103 - TESC Plan Example <br />everettwa.gov/DocumentCenter/View/7040 <br />Note: Construction Storm waterPollution Prevention Plans (Construction SWPPPs) that <br />involve engineering calculations must also be prepared by or under the direction of a <br />Washington State licensed professional engineer. <br />City of Everett Public Works <br />Small Project Stormwater Site Plan Report for Projects in <br />the Combined Sewer Area -April 2021 <br />14 <br />