Laserfiche WebLink
Lumio <br /> SMART ENERGY TODAY <br /> (SET) <br /> 1550 DIGITAL DR,LEHI,UT <br /> 84043,USA <br /> SYSTEM INFO <br /> (19)Q CELLS <br /> Q.PEAK DUO BLK ML-G10+ <br /> (40OW) <br /> (19)ENPHASE <br /> IQ8PLUS-72-2-US(240V) <br /> DC SYSTEM SIZE:7.600 kWDC <br /> ,N SOLAR BONDING CONNECTION GROUND PATHS " ■ .;; SM SOLAR ENDCLAMP, FIRST MODULE : ■ AC SYSTEM SIZE:5.700kWAC <br /> ■� MOUNT INSTALLATION GUIDE PAGE ■■ MOUNT INSTALLATION GUIDE PAGE <br /> - <br /> ------_-------------------------------------------------------------------------------------------------------------------------------------- --------------------------------------------------------------------------------------------------------------------------------------------- <br /> REVISIONS <br /> /1 Mo O © © DESCRIPTION DATE REV <br /> All A,DOG oGCFF�M REVISION 12/06/2022 A <br /> CFF F © pa S�Q�SEpFS , <br /> q� 0 <br /> '1100'. 0oa0tHG T-0 I� <br /> ONO/'QCT t'J r bh''pPO� � ra <br /> do <br /> PROJECT NAME&ADDRESS <br /> Nor <br /> BONDING MIDCLAMP ASSEMBLY BONDING MIDCLAMP ASSEMBLY BONDING RAIL SPLICE BAR RAILTO L-FOOTw/BONDING T-BOLT INSTALL MODULE END CLAMPS:The End INSTALL END CLAMPS ON RAIL: POSITION END CLAMPS: NOTE:To assist insertion of clamp into Q <br /> Bonding Hardware creates bond between splae serrated flange no removes L foot anodim— clamp is supplied as an assembly with a 1/2' Slide end clamp on to rail by Slide end clamp assembly rail slot,Pressure may be applied to (n <br /> ®Aluminum mid clamp with stainless steel bonding pins that pierce module frame Q bar and each rad su ©to bond L-Foot to stainless steel T-bolt <br /> anodization to bond module to module through clamp hex head bolt that is accessible at the ends of engaging the two t-guide brackets on to rail until bolt head top or side Of bracket as shown.Do <br /> y�Atuminum sell<e ba+spans across rail gap to Serrated T-bolt head penetrates ail anodization <br /> V creatr rad to rail bond.Rail on at least one Side grounded rails.The clamp should be installed on the with the top slat of the rails. engages with end of rail not force clamp into rail by pushing <br /> Stainless steel nut bonds aluminum clamp to stainless steel T-bolt of splice tofawdl De grounded to bond T-bolt nut.and L-foot to <br /> gr SM fait rails prior to installing end modules. bott is extended as far as possiule End clamps are positioned on on bolt with excessive force. O <br /> Serrated T-bolt head penetrates fail anodization to bond T-bott nut,clamp,and - so that clamp is positioned at max, rails prior to the first end N <br /> modules to SM rail distance from end of rail, module and prior to the last OD <br /> end module. Q O <br /> D - o <br /> E <br /> W- N <br /> I T%turNe ., -. _ 2—► ''{{ O <br /> IDC.W 11 R - - Or. , LU <br /> 4— - a-- BONDING <br /> 11% r, 1 LU 0') <br /> Nr T-BOLT sRF AkigF ss" � ea p. Z U U-100 <br /> E A Z � <br /> •SVSUM BONDING BONDING RAIL � -- �'\ D_ LU w L0 <br /> OUND �L'7� MICROINVERTER SPLICE BAR ©' <br /> ♦ MOUNT - - ,� ,U,^) w_ <br /> – vJ (] <br /> / WEEBLUG(OR ILSCO LUG) ® (n LU LU <br /> IF 1/1' �/ � Q <br /> BONDING MICROINVERTER MOUNT RACK SYSTEM GROUND INSTALL FIRST MODULE: ENGAGE CLAMP:While holding module in position and with Y Q Z <br /> [ Hex mit with Caot"tockwashesbonds metal (�WEEBwasher dimplesPierce anodizedfait to Install the first end module flange in full contact with rail,rotate end clamp bolt until For best appearance, <br /> II 4 microinverter flange to stainless sleet T-boil `-a create bond between rail and lugposition module flush 0– <br /> BONDING MiDCLAMv onto rails with the flange of clamp engages with flange to provide clamp force. with ends of rails.Rails Q Q <br /> 4 to tionSeamed-trollT-Whead penetrates it untiedmrodion <br /> ASSEMBLY - — Solid copper mreconneaedto lug isromedto the module frame positioned To ensure bolt is not over-torqued,use low torque setting should not extend more m <br /> to Doral T-Dolt-nuL and L-loot to grounded <br /> A <br /> SMmit-.:,_ ,,,.,, ;,,,. „l ©provide hrul system ground connection. between end clamps an ends on drill or If using an impact driver,stop rotation as soon as �s than 1R'beyond module. <br /> aw.,ms,.ryr,enneu un®f,—n,n ter- l'iT:I—%_,5—.L.zce,�:,nr.—.,w u. 1 Module must be fully <br /> aapgw.a rn+nnlrwarta.,.nr.'w ry.iiu �"ol�nix_ nT+s Nrfta of rails. impact action of driver begins. <br /> RAILTO LFOOr supported by rails and <br /> _WAON INGT-BOLT J11 AWE VALUE(See t.. �. s..i -�;.lc;o� '. � Cannot overhang ends O <br /> J <br /> End clamp bolt to 5 ft-lbs.No anti-seize of rails. 'IT <br /> r <br /> DATE: 12/6/2022 <br /> F SHEET NAME <br /> EQUIPMENT <br /> LSPECIFICATIONS <br /> SHEET SIZE <br /> ANSI B <br /> 11tt X 17" <br /> SHEET NUMBER <br /> PV-19 <br />