Laserfiche WebLink
Lumio <br /> SMART ENERGY TODAY <br /> (SET) <br /> 1550 DIGITAL DR,LEHI,UT <br /> 84043,USA <br /> SYSTEM INFO <br /> (19)Q CELLS <br /> Q.PEAK DUO BLK ML-G10+ <br /> (400W) <br /> (19)ENPHASE <br /> I08PLUS-72-2-US(240V) <br /> DC SYSTEM SIZE:7.600 kWDC <br /> SM■■ : SOLAR STANDARD SYSTEM GROUNDING ' ■ �• SOLAR APPENDIX C ■ 4C SYSTEM SIZE:5.700kWAC <br /> on■ MOUNT INSTALLATION GUIDE PACE an MOUNT UNIVERSALAF MIDCLAMP INSTALLATION GUIDE : PACE <br /> --------------------------------------------------------------------------------------------------------------------------------------------- --------------------------------------------------------------------------------------------------------------------------------------------- <br /> REVISIONS <br /> WEEBLUs DESCRIPTION DATE REV <br /> ----------- <br /> -__-_— ,Single Use Only i„„ <br /> +- \ REVISION 12/06/2022 A <br /> PROJECT NAME&ADDRESS <br /> ONLY ONE LUG PER ROW OF MODULES: % i i ■ <br /> Only one lug per row of modules is WEEBLUGCONDUCFOR-UNIRAC P/N 0080025: <br /> required. See Page F for additional lugs r�— _ �� Apply Anti Seize and insert a bolt in the aluminum rail and through the clearance hole / U) <br /> required for expansion joints. = in the stainless steel flat washer. Place the stainless steel flat washer on the bolt, D <br /> oriented so the dimples will contact the aluminum rail Place the lug portion on the 1.Position clamp to align T bolt with rail 2.Rotate damp clockwise 2/3 of a tum 3.Slide clamp into position against 4.Place second module. <br /> a bolt and stainless steel flat washer.Install stainless steel flat washer,lock washer and slot.Lower clamp and insertT•bolt into m engage T-bolt inside rail slot module. <br /> nut.Tighten the nut until the dimples are completely embedded into the rail and lug. rail slot N <br /> � <br /> TORQUE VALUE IO K 00 <br /> Los.(see Note mi PG.ai C7)- See product data sheet for more details,Modet No.WEEB•LUG•6., <br /> >Q CD <br /> GROUNDING LUG MOUNTING DETAILS: Star Warne lef O <br /> LO <br /> Details are provided for both the WEEB and Ksco products.The WEEBLug has a stnyte use only s NO <br /> grounding symbol located on the lug assembly.The Ilsco lug has a green colored - __ i Vi LLJ W <br /> set screw for grounding indication purposes.Installation must be in accordance <br /> with NFPA NEC 70,however the electrical designer of record should refer to the f / _lop / Z Z N <br /> latest revision of NEC for actual grounding conductor cable size. i TtRMINALTOItp n W W L _� D_ > 1­ <br /> I.., L0 <br /> Requued II not using approved integrated ..0 grounding uutruinvetel i i.acanam <br /> du1 0 <br /> ,p,e W the toll _^ W <br /> It,AWG:S5in it U) 0 <br /> 5 AWG V1ln Co W W <br /> GROUNDING LUG-BOLT 512E&DRILL 512E :5 n 1 <br /> �' Q <br /> GROUND LUG BOLT SIZE DRILL SIZE <br /> ILSCO LAY-IN UIGODNDUCTOR-UNIRAC P/N 008009P:Alternate Grounding Lug Y Z <br /> WEEBLug 1/4' WA-Pfau in Top SM Rall Slot Drill,deburr hole and bolt thru both rail walls per table. S.Tighten bolt and torque to 15 ft-lbs. NOTE:If excessive force is applied in d <br /> ASCO Lug x10-32 7/32' TORQUE VALUE S R lbs.(See Not, step 2,the cap may over-rotate causing Q Q <br /> See ILSCO product data sheet for more details,Model No.GBL-4DIIL it to be mis-aligned with the module Co <br /> Torque value depends on conductor size. frame.If this occurs,keep rotating the <br /> See product data sheet for torque value. cap clockwise until it returns to the <br /> NOTE:ISOLATE COPPER FROM ALUMINUM CONTACT TO PREVENT CORROSION original position. 0 <br /> J <br /> r <br /> DATE: 12/6/2022 <br /> F SHEET NAME <br /> EQUIPMENT <br /> LSPECIFICATIONS <br /> SHEET SIZE <br /> ANSI B <br /> 11rt X 17" <br /> SHEET NUMBER <br /> PV-20 <br />