My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2507 GRAND AVE 2023-11-28
>
Address Records
>
GRAND AVE
>
2507
>
2507 GRAND AVE 2023-11-28
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/3/2023 3:39:16 PM
Creation date
11/3/2023 7:36:59 AM
Metadata
Fields
Template:
Address Document
Street Name
GRAND AVE
Street Number
2507
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The proposed installation will be 6" max. above the roof surface (flush mounted) and parallel to the roof surface. <br /> Therefore, any increase in wind loading on the building structure from the solar panel installation is expected to be <br /> negligible. Wind is the governing lateral load case. Because the increase in lateral loading is not increased by more <br /> than 10%, per section 806.3 of the adopted IEBC,the structure need not be altered for lateral loading. <br /> Wind uplift on the panels has been calculated in accordance with the relevant provisions of ASCE 7-16.This loading <br /> has been used to verify the adequacy of the connection specified above. Connection locations should be in <br /> accordance with design drawings. <br /> Conclusion <br /> When the retrofits detailed in this letter's opening paragraph are performed, the structure will have adequate <br /> strength to support the proposed installation. Connections to the roof must be made per the "Roof Connection <br /> Details" section above. Copies of all relevant calculations are enclosed. <br /> Limitations and Disclaimers <br /> The opinion expressed in this letter is made in reliance on the following assumptions: the existing structure is in <br /> good condition (apart from the damage which shall be repaired or retrofit per the above); the existing structure is <br /> free from defects in design or workmanship; and the existing structure was code-compliant at the time of its design <br /> and construction.These assumptions have not been independently verified, and we have relied on representations <br /> made by the property owner and his or her agents with respect to the foregoing. The undersigned has not <br /> Electrical engineering is beyond the scope of this analysis. Solar panels must be installed per manufacturer <br /> specifications. Structural design and analysis of the adequacy of solar panels, racks, mounts, rails, and other <br /> components is performed by each component's respective manufacturer and the undersigned makes no statement <br /> of opinion regarding such components. This letter and the opinions expressed herein are rendered solely for the <br /> benefit of the permitting authority(city or county building department), and may not be utilized or relied on by any <br /> other party. <br /> If you have any questions or concerns, please contact our office at (855)-709-1181, or email me directly at <br /> Trevor.Jones@solgenpower.com. <br /> Sincerely, <br /> Trevor A.Jones, P.E. <br /> ORJON� <br /> of <br /> WA /y ' <br /> �F• r-, �G'J, <br /> co Z <br /> 201148 8 Q7 <br /> � <br /> SRFGIS \�`S/ONAL <br /> 7/27/2022 <br />
The URL can be used to link to this page
Your browser does not support the video tag.