My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9502 18TH AVE W UNIT N 2025-08-20
>
Address Records
>
18TH AVE W
>
9502
>
UNIT N
>
9502 18TH AVE W UNIT N 2025-08-20
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/20/2025 10:30:22 AM
Creation date
11/7/2023 3:33:39 PM
Metadata
Fields
Template:
Address Document
Street Name
18TH AVE W
Street Number
9502
Tenant Name
UNIT N
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
117
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BTL <br />ENGINEERING <br />SPECIAL INSPECTION <br />Date: <br />December 21, 2023 <br />To: <br />Pacific Ridge Homes <br />Attn: <br />Sam Wiper <br />From: <br />Tyler S. Wandschneider, P.E. <br />Project: <br />Harrison Point — Lot 12 <br />Thelon B- Garage Right <br />Pages: 1 <br />19011 Wood-Sno Road NE, Suite 100 <br />Woodinville, WA 98072-4436 <br />Phone: (425) 814-8448 <br />Fax: (425) 821-2120 <br />BTL Engineering has performed Special Inspection as required by the City of Everett for shear walls with edge <br />nailing at 4" on center or less for the abovementioned project. The following Special Inspection Report includes a <br />summary of our site visit. <br />Construction Documents: <br />❑ Construction Set dated 05/12/2023 <br />Progress of construction: <br />❑ Date of inspection:12/13/2023 <br />❑ Foundation completed <br />❑ Framing completed <br />Items observed: <br />1 st Floor Walls: <br />❑ Rear/Sides: P1-6—No Inspection Required <br />❑ Front P1-2 Shear Walls <br />o Edge Nailing and Sheathing Splices: Construction conforms to plan set <br />o Panel Seams Construction: Construction conforms to plan set <br />o Foundation Anchorage: Construction conforms to plan set <br />o Garage Pier Construction: The top layer ofnailing at the top of the beam over thepieris <br />missrngper detail 13/S07. The budderhas been notified and provided pictures of the <br />resolution. <br />2nd Floor Walls: <br />❑ All Sides: P1-6 - No Inspection required <br />Give me a call if you have any questions or comments. <br />Sincerely, <br />Tyler S. Wandschneider, P.E. <br />BTL Engineering <br />
The URL can be used to link to this page
Your browser does not support the video tag.