My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance 3979-23
>
Ordinances
>
Ordinance 3979-23
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/16/2023 10:56:42 AM
Creation date
11/16/2023 10:10:26 AM
Metadata
Fields
Template:
Ordinances
Ordinance Number
3979-23
Date
11/15/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
4 <br />The above table contains charges for inside City-limits. Areas outside City-limits, but <br />connected to the City’s water and sewer system, shall be charged the inside-City-limits <br />charge plus (unless otherwise required by law) a 25% surcharge. <br />2.Stormwater System Development Charge. In addition to water and sewer system <br />development charges, there shall be a stormwater system development charge based on <br />square footage of impervious surface area imposed on development within city limits that <br />contributes stormwater to the stormwater drainage system or to a receiving water body or <br />receiving waters*: <br />Development Type Stormwater System Development Charge <br />New Construction Base Charge (1 ISU ≤2500 sf): $823 <br />Additional charge for impervious area >2500 sf: $0.3292/sf <br />Existing <br />Development <br />adding new <br />impervious surface <br />area <br />Calculated per square foot of added impervious surface area at <br />$0.3292/sf <br />ISU = Impervious Surface Unit, defined as 2500 sf of impervious surface area. <br />*“Impervious surface,”, “stormwater,” “stormwater drainage system,” and “receiving <br />water body or receiving waters” as defined in chapter 14.28 EMC. <br />Section 4. EMC 14.08.135 is amended to add: <br />Effective January 1, 2026: <br />In addition to utility permit charges for sewer service, water service, and stormwater <br />and any inspection charges, there is hereby imposed, on the owners of properties, special <br />system development charges in the following amounts: <br />1.Water and Sewer System Development Charges <br />Meter Size <br />Water System <br />Development <br />Fee <br />Sewer System <br />Development <br />Charge <br />Total Water and <br />Sewer System <br />Development <br />Charges <br /> ¾” $5,159 $4,274 $9,433 <br />1” <br />domestic/fire* $5,159 $4,274 $9,433 <br />1” $8,616 $7,137 $15,753
The URL can be used to link to this page
Your browser does not support the video tag.