Laserfiche WebLink
3 <br />Development Type Stormwater System Development Charge <br />New Construction Base Charge (1 ISU ≤2500 sf): $747 <br />Additional charge for impervious area >2500 sf: $0.2988/sf <br />Existing <br />Development <br />adding new <br />impervious surface <br />area <br />Calculated per square foot of added impervious surface area <br />$0.2988/sf <br />ISU = Impervious Surface Unit, defined as 2500 sf of impervious surface area. <br />*“Impervious surface,”, “stormwater,” “stormwater drainage system,” and “receiving <br />water body or receiving waters” as defined in chapter 14.28 EMC. <br />Section 3. EMC 14.08.135 is amended to add: <br />Effective January 1, 2025: <br />In addition to utility permit charges for sewer service, water service, and stormwater <br />and any inspection charges, there is hereby imposed, on the owners of properties, special <br />system development charges in the following amounts: <br />1.Water and Sewer System Development Charges <br />*Domestic/Fire combination meter for Single Family Residences and Duplexes reviewed <br />under the International Residential Code, upsized due to the addition of a fire sprinkler <br />system. <br />Meter Size <br />Water <br />System <br />Developmen <br />t Charge <br />Sewer System <br />Development <br />Charge <br />Total Water and <br />Sewer System <br />Development <br />Charges <br /> ¾” $4,860 $4,149 $9,009 <br />1” domestic/fire* $4,860 $4,149 $9,009 <br />1” $8,115 $6,929 $15,044 <br />1 ½” $16,182 $13,817 $29,999 <br />2” $25,901 $22,115 $48,016 <br />3” $48,596 $41,492 $90,088 <br />4” $81,009 $69,167 $150,176 <br />6” $161,969 $138,292 $300,261 <br />8” $259,160 $221,276 $480,436 <br />10” $372,583 $318,118 $690,701 <br />12” $546,701 $466,783 $1,013,484