My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2812 BAKER AVE 2023-12-01
>
Address Records
>
BAKER AVE
>
2812
>
2812 BAKER AVE 2023-12-01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2023 4:20:43 PM
Creation date
11/21/2023 8:45:32 AM
Metadata
Fields
Template:
Address Document
Street Name
BAKER AVE
Street Number
2812
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Option I. Dispersion Design Worksheet <br />*This BMP can only be used for roof runoff per the SWMMWW* <br />• Roof area requiring mitigation(ftt): <br />• Minimum 50 ft flow path provided: Yes No <br />Dispersion systems with 25-50 it vegetated flow path must be modeled by a WA State Licensed <br />Engineer using a continuous runoff model to confirm project meets theJlow control <br />requirements, attach modeling results to this worksheet. Dispersion is not allowed where less <br />than 25 ft flow path can be achieved and another BMP shall be used to meet the flow control <br />requirement. <br />• Number of splashblock downspout dispersions: and/or Downspout dispersion <br />trenches (Minimum of two-50 ft long downspout dispersions and one per 350 sf of roof <br />area, is required to meet the fiow control requirement using this worksheep <br />_Downspout Dispersion areas do not overlap. <br />One of the following must be met for the dispersion area(s), check one: <br />The vegetated flow path consists of well -established lawn or pasture, landscaping with <br />well -established groundcover, native vegetation with natural groundcover, or an area that meets <br />BMP T5.13: Post -Construction Soil Quality and Depth. The groundcover is dense enough to help <br />disperse and infiltrate flows and to prevent erosion. <br />BMP T5.13 Port -Construction Soil Quality and Depth is being provided for dispersion areas <br />(area to be shown on project plans) <br />The following design criteria shall be met (check each to confirm the requirement has <br />been met): <br />I. Maintain a setback of at least 5 feet between any edge of the vegetated flow path and any structure or <br />property line. <br />2. Setback requirements in Section 4-4.1 (3) of the DOSS have been met <br />Including: <br />• 50 feet setback from slopes greater than 15 percent and greater than 10 feet in height. <br />3. Maintain a vegetated flow path of at least 50 feet between the discharge point and any property line, <br />structure, slope steeper than 15%, stream, wetland, lake, or other impervious surface. Sensitive area <br />buffers may count toward flow path lengths. <br />4. A maximum of 350 square feet of roof area may drain to each splashblock or dispersion trench. _ <br />S. Place a splashblock or a pad of crushed rock (2 feet wide by 3 feet long by 6 inches deep) at each <br />downspout discharge point <br />City or Everett Public Works <br />Small Pnwof Stamwefar She Plan Report farPrtyecfe in 12 <br />Me Continent Sewer AreaSeplember 2022 <br />
The URL can be used to link to this page
Your browser does not support the video tag.