My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2812 BAKER AVE 2023-12-01
>
Address Records
>
BAKER AVE
>
2812
>
2812 BAKER AVE 2023-12-01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2023 4:20:43 PM
Creation date
11/21/2023 8:45:32 AM
Metadata
Fields
Template:
Address Document
Street Name
BAKER AVE
Street Number
2812
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Option 2A Infiltration Trench Design Worksheet <br />BMP T5.10A Roof Downspout Full Infiltration <br />Downspout full infiltration systems are trench or drywell designs intended for use in infiltrating runofffrom <br />roof downspout drains. They are not designed to directly infiltrate runoff from pollutant generating <br />impervious surfaces. Projects that infiltrate runoff from pollutant generating surfaces must provide <br />treatment prior to infiltration. <br />Infiltration Trench <br />The minimum trench length is based upon the soil type in the location of the infiltration trench. The soils <br />reportwill provide the USDA Soil Type. Thetable below provides the minimum trench length per 1,000 <br />fta of contributing impervious area. Infiltration trenches shall be designed in accordance with the <br />SWMMWW. <br />Trench length required (ft) = Impervious area (ftt) *((minimum trench length)(ft)) <br />1000 (fts) <br />• Net new impervious area requiring mitigation(Rr): 2296 <br />• USDA Soil Type per soils report <br />• Trench length required: <br />(Trench length cannot exceed 100 R. If length exceeds 100 R, multiple trenches will be required.) <br />• Number of trenches: r Trenm. 4 n wme <br />• Length of each trench: 100f <br />The following setback and design requirements have been met: <br />I. The maximum length of the trench shall not exceed 100 feet from the inlet sump. ✓ <br />2. The minimum spacing between trench centerlines shall be 6 feet <br />3. Infiltration trenches should not be built on slopes steeper than 25% (4:1). A geotechnical analysis and <br />report may be required on slopes over 15%, or if the proposed trench is located within 200 feet of the <br />top of a slope steeper than 40%, or in a landslide hazard area. 100 <br />City ofEvereb Public Wads <br />Small Pmect Slwmw ar Site Plen Reporl forPnyects in 13 <br />Me Corndned Sewer AreaSeplembw 2022 <br />
The URL can be used to link to this page
Your browser does not support the video tag.