Laserfiche WebLink
•Tabjung Lee1.7 <br /> Plan Check Number: B2205-001., First Building Review <br /> September 8, 2022 <br /> c. ,'die floor may result in a vertical clearance that is less than 7 feet as required by Section R:305.1. <br /> The minimum required height should be maintained and specified in the drawings. <br /> Ceiling height 7ft min. See note on floor plan Pantry & Den <br /> See <br /> eisrnic restraints should be specified for the water heater per SectionMU:307.2. <br /> note on floor plan <br /> 9.he project includes exposing the exterior envelope cavities for the entire building. The building is <br /> required to be insulated per WSEC Section R503.1.1. The minimum required thermal rating for the <br /> exterior walls is R-15. See typical wall section on sheet 4 <br /> 10.The project includes replacement of some of the existing windows and exterior doors as observed in <br /> recent electrical inspection photography, including but not limited to the Master Bedroom window and <br /> IPanty/Garage door. The required thermal ratings for each type of vertical fenestration should be <br /> specified. See WSEC Table R402.1.1. See note on floor plan <br /> Structural <br /> 1. The project involves removing walls that are or may be load bearing, including but not limited to the <br /> center wall in the garage and the walls to convert the second bedroom into a Master Bathroom and <br /> jeloset. Roof and floor framing and foundation plans showing the modified load paths are required. The <br /> modified load paths should comply with the prescriptive limitations of the IRC. Alternatively, an <br /> engineered analysis and design may be performed per Section R301.1.3; sealed and signed drawings <br /> and calculations prepared by a professional engineer licensed in the state of Washington are required <br /> per RCW 18.43.010, 18.43.020, and 18.43.070. See Section R301.1. The interior wall partition to be <br /> removed is a non-load bearing wall. <br /> Details for the construction of the new walls should be included. The details should specify connections <br /> for the top and bottom framing plates to the existing structure. The details should include headers <br /> (e.g., garage wall supporting roof, etc.). See Sections R106.1.1, R301.1, R602.4, and R602.7. <br /> New interior partition to have 2x4 studs @ 16"o.c. with double top plates lap splices at 48 inches and <br /> 2x4 bottom plate. See typical wall section on sheet 4 <br /> 3. The project appears to include a new raised floor system in the Pantry/Den area of the house. Note <br /> /hat there is, a new step between the Pantry and Garage. No raises floor system is currently p-esent as <br /> documented by recent electrical inspection photography. The floor construction should be shown. See <br /> Sections R106.1.1, R318, and Chapter 5, and architectural comments above. <br /> No new raised floor to install at Pantry and Garage. See floor plan <br /> ,,A. Details for tie construction of landings, stairs, and ramps for the egress route should be included in the <br /> construction drawings. See Section R106.1.1 and architectural comments above. <br /> There is an existing concrete steps at egress route and there is no ramp. <br /> See floor plan at entry living room <br /> (-O3200 Cedar Street © 425.257.8810 O everetteps@everettwa.gov <br /> ---) Everett,WA 98201 425.257.8857 fax everettwa.gov/permits <br /> Page 2 of 2 <br />