Laserfiche WebLink
• I <br /> .,include a note requiring the contractor to verify the walls are not load bearing prior to demolition. See IRC <br /> Section R301.1. <br /> 17. Details for the construction of the new walls should be included. The details should specify connections <br /> for the top and bottom framing plates to the existing structure. See IRC Sections R106.1.1 and R301.1. <br /> 18. A general fastener schedule should be provided per IRC Table R602.3(1). Providing a reference to this <br /> table in the drawings does not satisfy this requirement. In addition,the make and model of proprietary <br /> hardware should be specified where used for connections. <br /> Review of your project will be performed in the order received once the required documentation has been <br /> submitted. Please let me know if you have questions. <br /> Drew Martin, P.E.,S.E. <br /> am <br /> - Associate Engineer—Commercial Plans Examiner I Permit Services <br /> 425.257.8810 13200 Cedar Street, 2nd Floor, Everett,WA 98201 <br /> EVERETT Phone Hours: M/W/T:8 am -12 pm & 1 pm—3 pm;Tu: 1:OOpm-3:O0pm <br /> everettwa.gov/permits I Facebook I Twitter <br /> Note:Emails and attachments sent to and from the City of Everett are public records and may be subject to disclosure pursuant to the Public <br /> Records Act. <br /> 3 <br /> 1 <br />