Laserfiche WebLink
• • t <br /> 9 The project includes replacement of the existing windows and exterior <br /> doors. The required thermal ratings for each type of vertical fenestration should be <br /> specified.- See.WSEC'Table R402.1.1. '\ <br /> 10. The house is required to have a heating system per IRC Section R303.9. The <br /> type and location of the system should be specified. If the system is new, it should <br /> be indicated as such in the drawings. Gas appliances are prohibited in the locations <br /> specified in Section G2406. �; L'1J <br /> 11. The house is required to have a water heating system per IRC Section R306.4. <br /> The type and location of the system should be specified. If the system is new, it <br /> should be indicated as such in the drawings. Seismic restraints should be provided <br /> per Section M1307.2. Gas appliances are prohibited in the locations specified in <br /> Section G2406. f ..1 <br /> Structural: swe c W o ' ST-712-oc ,6, <br /> 12. The proposed prof project includes ural work. Structural drawing should be <br /> submitted that include framing plans, sections, details, construction schedules, <br /> fastening schedules, materials requirements, general notes, special inspection <br /> requirements, etc. The drawings should substantiate compliance with the <br /> prescriptive requirements of the IRC. See IRC Sections R106.1.1 and R301.1. <br /> 13. The project involves removing load-baring walls. Framing plans showing the <br /> existing roof construction and the modified load paths are required. The modified <br /> load paths should comply with the prescriptive limitations of the IRC. Alternatively, <br /> an engineered analysis and design may be performed per IRC Section R301.1.3; <br /> sealed and signed drawings and calculations prepared by a professional engineer <br /> licensed in the state of Washington are required per RCW 18.43.010, 18.43.020, <br /> and 18.43.070. See IRC Section R301.1. <br /> 14. Foundations should comply with IRC Chapter 4. Wood-framed construction on <br /> foundations should comply with Section R317.1, including clearance per Item 5. <br /> 15. Headers should comply with IRC Section R602.7. King and jamb studs should <br /> be specified for each header per Section R602.7.5. <br /> 16. The proposed project includes the demolition of non-bearing walls. Framing <br /> plans for the floor, ceiling, and roof should be provided to substantiate that the walls <br /> are not load-bearing. The plans should also include a note requiring the contractor <br /> to verify the walls are not load bearing prior to demolition. See IRC Section R301.1. <br /> 17. Details for the construction of the new walls should be included. The details <br /> should specify connections for the top and bottom framing plates to the existing <br /> structure. See IRC Sections R106.1.1 and R301.1. <br /> \3 <br />