My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9602 EVERGREEN WAY IMRANS MARKET 2023-12-07
>
Address Records
>
EVERGREEN WAY
>
9602
>
IMRANS MARKET
>
9602 EVERGREEN WAY IMRANS MARKET 2023-12-07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/7/2023 11:14:44 AM
Creation date
11/27/2023 11:31:07 AM
Metadata
Fields
Template:
Address Document
Street Name
EVERGREEN WAY
Street Number
9602
Tenant Name
IMRANS MARKET
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
VERETT <br />0 <br />Permit Number: P2104-015 <br />Applied: 4/8/2021 <br />Issued:7/13/2021 <br />Status: FINALED <br />Parent Permit: B2104-032 <br />Parent Project: <br />Permit Inspections <br />City of Everett <br />Approved:6/23/2021 <br />Finaled: 6/14/2023 <br />Description: PLUMBING FOR TI-FLOOR DR, 2 HAND SINKS, MOP SINK, 3 <br />CMPTMNT <br />Site Address: 9602 EVERGREEN WAY <br />City, State Zip Code: EVERETT, WA <br />Applicant: WILLIAM PAGE <br />Owner: IMRANS MARKET II LLC <br />Contractor: SEATTLE'S BEST PLBG & RTR LLC <br />Details: <br />SINKS AND A GREASE INTERCEPTOR <br />PLUMBING FOR TI-FLOOR DR, 2 HAND SINKS, MOP SINK, 3 CMPTMNT <br />11 <br />SCHEDULED DATE <br />COMPLETED DATE TYPE <br />INSPECTOR <br />RESULT <br />REMARKS <br />11/18/2021 <br />11/18/2021 PLUMB 03-ROUGH <br />JASON <br />OTHER <br />IN <br />MORRISSEY <br />Notes: <br />206 354 8237 <br />(11/18/2021 9:28 AM JJM) <br />- Consultation. <br />11/23/2021 <br />11/23/2021 <br />PLUMB 03-ROUGH <br />JASON <br />APPROVAL <br />IN <br />MORRISSEY <br />Notes: <br />FIRAZ <br />206-354-8237 <br />2/8/2023 <br />2/8/2023 <br />PLUMB 08-FINAL <br />JASON <br />CORRECTION <br />see notes <br />MORRISSEY <br />REQUIRED <br />Notes: <br />FIRAZ <br />206-354-8237 <br />BUILDING IS OPEN <br />- Hot and cold supply is reversed on both three compartment sink faucets. Hot needs to be on left and cold on right. Per the UPC.- Install clean -out on <br />indirect piping for three compartment sink per the UPC for indirect waste pipe exceeding 90 degrees of direction.- Install mechanical vent downstream <br />of p trap per the instruction manual.- HGI is installed backwards.- Remove corrugated offset on bathroom sink trap arm. Trap arm must take off <br />horizontal to vent per the UPC. <br />6/13/2023 <br />6/13/2023 <br />PLUMB 08-FINAL <br />JASON <br />APPRVD-PERMIT <br />MORRISSEY <br />FINAL <br />Notes: <br />425-239-0349 <br />SOBRKT@AOL.COM <br />I <br />Printed: Wednesday, 14 June, 2023 1 of 1 rk <br />SUPERION <br />
The URL can be used to link to this page
Your browser does not support the video tag.