My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Always Active Service 11/27/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Always Active Service 11/27/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/27/2023 12:26:15 PM
Creation date
11/27/2023 11:40:05 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Always Active Service
Approval Date
11/27/2023
Council Approval Date
11/29/2023
Department
Public Works
Department Project Manager
Christina Curtis
Subject / Project Title
Citywide Bicycle Wayfinding Project
Tracking Number
0004034
Total Compensation
$363,113.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
408
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT - CITYWIDE BICYCLE WAYFINDING <br />STATE FUND# HLP-PB21(014) <br />WO#3786 September 25, 2023 <br /> 4 <br /> 1 <br />Before award of a public works contract, a bidder must meet at least the minimum 2 <br />qualifications of RCW 39.04.350(1) to be considered a responsible bidder and qualified to 3 <br />be awarded a public works project. 4 <br /> 5 <br />COE 1-02.2.RTF 6 <br />1-02.2 Plans and Specifications 7 <br />(June 27, 2011 APWA GSP) 8 <br /> 9 <br />Delete this section and replace it with the following: 10 <br /> 11 <br />Information as to where Bid Documents can be obtained or reviewed can be found in the 12 <br />Call for Bids (Advertisement for Bids) for the work. 13 <br /> 14 <br />After award of the contract, plans and specifications will be issued to the Contractor at no 15 <br />cost as detailed below: 16 <br /> 17 <br />To Prime Contractor No. of Sets Basis of Distribution <br />Reduced plans (11" x 17") 5 Furnished automatically <br />upon award. <br />Contract Provisions <br /> <br />5 Furnished automatically <br />upon award. <br />Large plans (e.g., 22" x <br />34") 3 Furnished only upon <br />request. <br /> 18 <br />Additional plans and Contract Provisions may be obtained by the Contractor from the 19 <br />source stated in the Call for Bids, at the Contractor’s own expense. 20 <br /> 21 <br />COE 1-02.5.rtf 22 <br />1-02.5 Proposal Forms 23 <br />(July 31, 2017 APWA GSP & City of Everett) 24 <br /> 25 <br />Delete this section and replace it with the following: 26 <br /> 27 <br />The Proposal Form will identify the project and its location and describe the work. It will 28 <br />also list estimated quantities, units of measurement, the items of work, and the materials 29 <br />to be furnished at the unit bid prices. The bidder shall complete spaces on the proposal 30 <br />form that call for, but are not limited to, unit prices; extensions; summations; the total bid 31 <br />amount; signatures; date; and, where applicable, retail sales taxes and acknowledgment 32 <br />of addenda; the bidder’s name, address, telephone number, and signature; the bidder’s 33 <br />UDBE/DBE/M/WBE commitment, if applicable; a State of Washington Contractor’s 34 <br />Registration Number; and a Business License Number, if applicable. Bids shall be 35 <br />completed by typing or shall be printed in ink by hand, preferably in black ink. The required 36 <br />certifications are included as part of the Proposal Form. 37 <br /> 38 <br />The Contracting Agency reserves the right to arrange the proposal forms with alternates 39 <br />and additives, if such be to the advantage of the Contracting Agency. The bidder shall bid 40 <br />on all alternates and additives set forth in the Proposal Form unless otherwise specified. 41
The URL can be used to link to this page
Your browser does not support the video tag.