My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Always Active Service 11/27/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Always Active Service 11/27/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/27/2023 12:26:15 PM
Creation date
11/27/2023 11:40:05 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Always Active Service
Approval Date
11/27/2023
Council Approval Date
11/29/2023
Department
Public Works
Department Project Manager
Christina Curtis
Subject / Project Title
Citywide Bicycle Wayfinding Project
Tracking Number
0004034
Total Compensation
$363,113.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
408
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT - CITYWIDE BICYCLE WAYFINDING <br />STATE FUND# HLP-PB21(014) <br />WO#3786 September 25, 2023 <br /> 56 <br />“Plastic Bike Lane Symbol with green background”, per Each 1 <br />“Plastic Bike-turn Box with green background”, per each 2 <br />“Plastic Bike Route on Sidewalk Symbol”, per each 3 <br />“Plastic Bike Symbol – Driveway”, per Each 4 <br />“Plastic Sharrow Straight”, per Each 5 <br />“Plastic Sharrow Straight (white on green background)”, per Each 6 <br />“Plastic Sharrow Straight with brackets”, per Each 7 <br />“Plastic Sharrow Turn”, per Each 8 <br />“Plastic Sharrow Turn (white on green background)”, per Each 9 <br />“Plastic Sharrow Jog ”, per Each 10 <br /> 11 <br /> 12 <br />COE 8-36 E-FILES.RTF 13 <br />8-36 ELECTRONIC FILES 14 <br />Section 8-36 is new and is supplemented by the following: 15 <br /> 16 <br />(******) 17 <br /> 18 <br />When requested by the Contractor, the City will provide an electronic version of the 19 <br />construction plans (drawings), for use by the Contractor at the Contractor’s own risk. In all 20 <br />cases, the approved paper construction plans are the official contract documents. If the 21 <br />Contractor wishes to use the electronic version of the construction plans for the purposes of 22 <br />providing construction surveying of proposed improvements, it shall be the Contractor’s 23 <br />responsibility to verify that any coordinates used from the electronic file exactly match the 24 <br />station and offset location given in the contract construction plans. Construction plans are 25 <br />diagrammatic in nature. The coordinate locations of the various graphic elements within the 26 <br />electronic files may not necessarily be precisely shown with respect to their coordinate 27 <br />position. In all cases, the location callouts in the contract construction plans shall govern. 28 <br /> 29 <br />***** 30 <br /> 31 <br /> 32 <br />END DIVISION8.RTF 33 <br /> 34 <br />END DIVISION 8 35 <br /> 36
The URL can be used to link to this page
Your browser does not support the video tag.