Laserfiche WebLink
SCOPE AND ADMINISTRATION <br /> [A] 106.5.1 Approved construction documents. When any ordinance or regulation or any of the provisions of this <br /> the code official issues the permit where construction doc- code. <br /> uments are required, the construction documents shall be [A] 106.5.6 Retention of construction documents. One <br /> endorsed in writing and stamped "APPROVED" Such set of approved construction documents shall be retained <br /> approved construction documents shall not be changed, by the code official for a period of not less than 180 days <br /> modified or altered without authorization from the code from date of completion of the permitted work, or as <br /> official. Work shall be done in accordance with the required by state or local laws. One set of approved con- <br /> approved construction documents. struction documents shall be returned to the applicant,and <br /> The code official shall have the authority to issue a per- said set shall be kept on the site of the building or work at <br /> mit for the construction of part of an installation before the all times during which the work authorized thereby is in <br /> construction documents for the entire installation have progress. <br /> been submitted or approved, provided adequate informa- <br /> tion and detailed statements have been filed complying [A] 106.5.7 Previous approvals. This code shall not <br /> require changes in the construction documents, eonstruc- <br /> with all pertinent requirements of this code. The holder of <br /> such permit shall proceed at his or her own risk without tion or designated occupancy of a structure for which a <br /> nce that the permit for the entire installation will be lawful permit has been heretofore issued or otherwise law- <br /> assurance <br /> fully authorized, and the construction of which has been <br /> grantepursued in good faith within 180 days after the effective <br /> [A]106.5.2 Validity.The issuance of a permit or approval date of this code and has not been abandoned. <br /> of construction documents shall not be construed to be a [A] 106.5.8 Posting of permit.The permit or a copy shall <br /> permit for, or an approval of, any violation of any of the be kept on the site of the work until the completion of the <br /> provisions of this code or of other ordinances of the juris- project. <br /> diction.A permit presuming to give authority to violate or <br /> cancel the provisions of this code shall be invalid. [A] 106.6 Fees. A permit shall not be issued until the fees <br /> prescribed in Section 106.6.2 have been paid, nor shall an <br /> The issuance of a permit based upon construction docu- amendment to a permit be released until the additional fee,if <br /> ments and other data shall not prevent the code official any,due to an increase of the installation,has been paid. <br /> from thereafter requiring the correction of errors in said <br /> construction documents and other data or from preventing [A] 106.6.1 Work commencing before permit issuance. <br /> building operations from being carried on thereunder Any person who commences work on an installation <br /> when in violation of this code or of other ordinances of before obtaining the necessary permits shall be subject to <br /> this jurisdiction. 100 percent of the usual permit fee in addition to the <br /> [A] 106.5.3 Expiration.Every permit issued by the code required permit fees. <br /> official under the provisions of this code shall expire by [A] 106.6.2 Fee schedule. The fees for work shall be as <br /> limitation and become null and void if the work authorized indicated in the following schedule. <br /> by such permit is not commenced within 180 days from [JURISDICTION TO INSERT APPROPRIATE SCHEDULE] <br /> the date of such permit, or is suspended or abandoned at [A] 106.6.3 Fee refunds.The code official shall authorize <br /> any time after the work is commenced for a period of 180 the refunding of fees as follows. <br /> days.Before such work recommences, a new permit shall 1. The full amount of any fee paid hereunder that was <br /> be first obtained and the fee therefor shall be one-half the erroneously paid or collected. <br /> amount required for a new permit for such work,provided <br /> that changes have not been and will not be made in the 2. Not more than [SPECIFY PERCENTAGE] percent of <br /> original construction documents for such work, and fur- the permit fee paid where work has not been done <br /> ther that such suspension or abandonment has not under a permit issued in accordance with this code. <br /> exceeded one year. 3. Not more than [SPECIFY PERCENTAGE] percent of <br /> [A]106.5A Extensions.A permittee holding an unexpired the plan review fee paid where an application for a <br /> permit shall have the right to apply for an extension of the permit for which a plan review fee has been paid is <br /> time within which he or she will commence work under withdrawn or canceled before any plan review effort <br /> that permit when work is unable to be commenced within has been expended. <br /> the time required by this section for good and satisfactory The code official shall not authorize the refunding of <br /> reasons. The code official shall extend the time for action any fee paid, except upon written application filed by the <br /> by the permittee for a period not exceeding 180 days if original permittee not later than 180 days after the date of <br /> there is reasonable cause. A permit shall not be extended fee payment. <br /> more than once.The fee for an extension shall be one-half <br /> the amount required for a new permit for such work. <br /> [A] 106.5.5 Suspension or revocation of permit. The SECTION 107 (IFGC) <br /> code official shall have the authority to suspend or revoke INSPECTIONS AND TESTING <br /> a permit issued under the provisions of this code wherever [A] 107.1 General.The code official is authorized to conduct <br /> the permit is issued in error or on the basis of incorrect, such inspections as are deemed necessary to determine com- <br /> inaccurate or incomplete information, or in violation of pliance with the provisions of this code.Construction or work <br /> 2015 INTERNATIONAL FUEL.GAS CODE' 5 <br />