Laserfiche WebLink
SCOPE AND ADMINISTRATION <br /> for which a permit is required shall be subject to inspection not comply shall be corrected and such portion shall not be <br /> by the code official, and such construction or work shall covered or concealed until authorized by the code official. <br /> remain accessible and exposed for inspection purposes until [A] 107.2.4 Approved inspection agencies. The code <br /> approved. Approval as a result of an inspection shall not be official is authorized to accept reports of approved agen- <br /> construed to be an approval of a violation of the provisions of cies, provided that such agencies satisfy the requirements <br /> this code or of other ordinances of the jurisdiction. Inspec- as to qualifications and reliability. <br /> tions presuming to give authority to violate or cancel the pro- <br /> visions of this code or of other ordinances of the jurisdiction [A] 107.2.5 Evaluation and follow-up inspection ser- <br /> shall not be valid. vices.Prior to the approval of a prefabricated construction <br /> assembly having concealed work and the issuance of a <br /> [A] 107.2 Required inspections and testing.The code offi- permit, the code official shall require the submittal of an <br /> cial, upon notification from the permit holder or the permit evaluation report on each prefabricated construction <br /> holder's agent, shall make the following inspections and assembly, indicating the complete details of the installa- <br /> other such inspections as necessary, and shall either release tion, including a description of the system and its compo- <br /> that portion of the construction or notify the permit holder or nems,the basis upon which the system is being evaluated, <br /> the permit holder's agent of violations that are required to be test results and similar information and other data as nec- <br /> corrected. The holder the permit shall be responsible for essary for the code official to determine conformance to <br /> scheduling such inspections. this code. <br /> 1. Underground inspection shall be made after trenches or [A] 107.2.5.1 Evaluation service. The code official <br /> ditches are excavated and bedded, piping is installed shall designate the evaluation service of an approved <br /> and before backfill is put in place. Where excavated agency as the evaluation agency, and review such <br /> soil contains rocks,broken concrete,frozen chunks and agency's evaluation report for adequacy and confor- <br /> other rubble that would damage or break the piping or mance to this code. <br /> cause corrosive action,clean backfill shall be on the job <br /> site. [A] 107.2.5.2 Follow-up inspection. Except where <br /> ready access is provided to installations, appliances, <br /> 2. Rough-in inspection shall be made after the roof,fram- service equipment and accessories for complete inspec- <br /> ing, fireblocking and bracing are in place and compo- tion at the site without disassembly or dismantling,the <br /> nents to be concealed are complete, and prior to the code official shall conduct the in-plant inspections as <br /> installation of wall or ceiling membranes. frequently as necessary to ensure conformance to the <br /> 3. Final inspection shall be made upon completion of the approved evaluation report or shall designate an inde- <br /> installation. pendent, approved inspection agency to conduct such <br /> The requirements of this section shall not be considered to inspections. The inspection agency shall furnish the <br /> prohibit the operation of any heating appliance installed to code official with the follow-up inspection manual and <br /> replace an existing heating appliance serving an occupied a report of inspections upon request, and the installa- <br /> portion of a structure in the event a request for inspection of tion shall have an identifying label permanently affixed <br /> such heating appliance has been filed with the department not to the system indicating that factory inspections have <br /> more than 48 hours after replacement work is completed,and been performed. <br /> before any portion of such appliance is concealed by any per- [A] 107.2.5.3 Test and inspection records. Required <br /> manent portion of the structure. test and inspection records shall be available to the <br /> [A] 107.2.1 Other inspections. In addition to the inspec- code official at all limes during the fabrication of the <br /> tions specified in Section 107.2,the code official is autho- installation and the erection of the building; or such <br /> rized to make or require other inspections of any records as the code official designates shall be filed. <br /> construction work to ascertain compliance with the provi- [Al 107.3 Testing.Installations shall be tested as required in <br /> sions of this code and other laws that are enforced. this code and in accordance with Sections 107.3.1 through <br /> [A]107.2.2 Inspection requests.It shall be the duty of the 107.3.3• Tests shall be made by the permit holder and <br /> holder of the permit or his or her duly authorized agent to observed by the code official. <br /> notify the axle official when work is ready for inspection. [A] 107.3.1 New,altered,extended or repaired installa. <br /> It shall be the duty of the permit holder to provide access tions.New installations and parts of existing installations, <br /> to and means for inspection of such work that is required which have been altered,extended,renovated or repaired, <br /> by this code. shall be tested as prescribed herein to disclose leaks and <br /> [A] 107.2.3 Approval required. Work shall not be done defects. <br /> beyond the point indicated in each successive inspection [A]107.3.2 Apparatus,instruments,material and labor <br /> without first obtaining the approval of the code official. for tests. Apparatus, instruments, material and labor <br /> The code official, upon notification, shall make the required for testing an installation or part thereof shall be <br /> requested inspections and shall either indicate the portion furnished by the permit holder. <br /> of the construction that is satisfactory as completed, or [A] 107.3.3 Reinspection and testing.Where any work or <br /> notify the permit holder or his or her agent wherein the installation does not pass an initial test or inspection, the <br /> same fails to comply with this code. Any portions that do necessary corrections shall be made so as to achieve com- <br /> 6 2015 INTERNATIONAL FUEL GAS CODE" <br /> e <br />