Laserfiche WebLink
■ = A & R Scope `„I' <br /> = Existing or A&RSOLAR <br /> Others Scope <br /> 3211 Martin Luther King Jr Way S. <br /> Seattle,WA 98144(206)707-9937 <br /> --- A <br /> I � <br /> I I <br /> ———————————————— -- I <br /> THIS DRAWING CONSTITUTES THE <br /> 20A/2p I CONFIDENTIAL INFORMATION OF A&R SOLAR <br /> Branch 1 Z A I Q-� AND ITS RECEPTOR.POSSESSION DOES NOT <br /> Supply Side Connection CONFER ANY RIGHT IN OR LICENSE TO USE IT <br /> OR THE INFORMATION DISCLOSED HEREIN <br /> 705.11 NOR ANY RIGHT TO REPRODUCE THIS <br /> 10 modules <br /> + 20A/2p I DRAWING OR ANY PART HEREIN WITHOUT <br /> 5 THE WRITTEN CONSENT OF A&R SOLAR. <br /> Branch 2 2 I O <br /> ::2:OA/2p I Located less than 10' (Existing) M <br /> 9 modules + i from net meter and Main Service Panel <br /> less than 10' from tap (1ph 240V Service) <br /> Branch 3 Z I I Main Breaker: 200A <br /> I I <br /> 7modules + I----------------- — Bus Rating:200A <br /> I <br /> I <br /> A A I R U <br /> #6 GEC i Vf a <br /> Service entrance conductors ,--I <br /> Neutral Bar 4/0 XHHW-2 0 N N O <br /> w/ bonding jumper (L1 &L2) COV) M > N <br /> 2/0 00 <br /> (N)W-2 ED Q1 Q O <br /> � C)o oln � Q <br /> *; o L N co <br /> 0 Equipment Schedule ��� U 0 a <br /> Ref. Category Equipment QTY Watts Output AC #of OCPID a 10 w <br /> 1 Modules REC410AA Pure 26 1 nverter Specs u u Voltage Inverters L@Lranch <br /> O <br /> 2 Inverters Enphase IQ8M-72-M-US 26 Enphase IQ81VI-72-M-US 325 1.35 240 26 20 <br /> 3 Jbox JBox 2 ****N/A**** 0 0 0 0 0 <br /> 41 Loadcenters Enphase IQ Combiner Panel 80A, 240V 1 ****N/A**** 0 0 0 0 0 <br /> Breakers 2p20A 3 <br /> 5 Disconnect 60A 240V 2 Poled Heavy Duty, Fuse, Lockable 1 Module Specs Watts w Imp Vmp Voc Isc <br /> DisconnectFuse FLNR-.50 A Fuses for Disconnect (qty 1/pole) 2 REC410AA Pure 410 9.61 42.7 49 10.35 <br /> Monitoring I Enphase IQ Monitoring 1 1 1 Temp. Adjusted 0 0 38.9 1 52.8 0 REVISIONS <br /> Rev. #: Date: <br /> General Notes: <br /> 0 Conductor Schedule Utility: SnoPud Designed by: Thomas N <br /> Summary Distance Current Operating Voltage V. Drop 1. EGC Where exposed to physical damage will be #6AWG Project Manager: <br /> Bare CU Arthur Eith <br /> (ft) @125% Voltage Drop (total) 2. If installing conduit on the roof, maintain greater than 7/8" (612) 298-1795 <br /> A (2)#12 CU, (1)#6 EGC, Q Cable, AIR 50 16.88A 240V 1.11% 2.18% above the surface <br /> ( ) 3. NEC 690.12: Rapid Shutdown initiated by loss of Grid or AC Current Date:Sep 29, 2023 <br /> B (6)#10 CU, (1)#10 EGC, THWN-2, 0.75"EMT(min) 50 16.88A 240V 0.70% Disconnect <br /> C (2)#8 CU, (1)#8 N, (1)#10 EGC, THWN-2, 0.75"EMT(min) 10 43.88A 240V 0.23% 4. For supply side taps, a #6 GEC (min.) will be run separately <br /> from the disconnect and connected to the grounding electrode E1 Single Line <br /> D (2)#6 CU, (1)#6 N, THWN-2, 1"PVC(min) 10 43.88A 240V 0.14% with an irreversible crimp <br />