My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance 2450
>
Ordinances
>
Ordinance 2450
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2023 3:47:34 PM
Creation date
12/1/2023 3:47:30 PM
Metadata
Fields
Template:
Ordinances
Ordinance Number
2450
Date
7/23/1929
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> L • • <br /> ORDINANCE NO. 2450 <br /> An Ordinance providing for the acquisition by condemna- <br /> tion, of lands, water, water rights, easements, rights-of-way, <br /> privileges, franchises and property necessary or convenient for <br /> the proper construction, control, maintenance and operation of <br /> the proposed additional water supr(;ly system for the City of Ev- <br /> erett, and additions, betterments and extensions thereto, in- <br /> cluding the construction of a diversion dam and intake on the <br /> Sultan River in Township Twenty-nine (29 ), North Range Eight <br /> (8 ), E. W. M., also a pipe line and tunnel from said int ake' to <br /> Lake Chaplain, also a dam, spillway and control works for stor- <br /> age of water in Lake Chaplain, also a pipe line from Lake Chap- <br /> lain to a connection with the existing water system of the Ci- <br /> ty of Everett; directing the City Attorney to institute con-. <br /> demnation proceedings for the purpose of acquiring said land <br /> and other rights, and declaring an emergency. <br /> WHEREAS, the voters of the City of Everett voting at <br /> a special election held for that purpose on the 4th day of <br /> May, 1929, ratified the system or plan proposed in Ordinance <br /> No. 2433 of said city, which ordinance proposed to' the voters <br /> of the City of Everett that the City of Everett make additions, <br /> betterments and extensions to its present water supply system by <br /> the construction of a diversion dam and intake on the Sultan Riv- <br /> er in Township 29, North Range 8, E. W. M., also a pipe line and <br /> tunnel from said intake to Lake Chaplain, also a dam, spillway <br /> and control works for storage of water in Lake Chaplain, also <br /> a pipe line from Lake Chaplain to a connection with the existing <br /> water system of the City of Everett, also all necessary valves, <br /> blowoffs, tunnels, bridges and other structures and appurten- <br /> ances necessary for the construction, control, maintenance and <br /> operation of said pipe line, also such improvements to the ex- <br /> isting water system in Everett as are necessary to make the <br />
The URL can be used to link to this page
Your browser does not support the video tag.