Laserfiche WebLink
Dust control measures will be applied as needed to fugitive dust from leaving the site in accordance with <br /> state and local permit requirements. Dust Control measures should be in place prior to work which has <br /> the potential to create dust. The contractor shall note proposed work,weather and soil conditions, and <br /> other factors as needed to anticipate potential dust problems. <br /> Alternate soil stabilization BMPS are included in Appendix C as a quick reference tool for the on-site <br /> inspector in the event the BMP listed above is deemed ineffective or inappropriate during construction <br /> to satisfy the requirements set forth in General NPDES permit(Appendix D).To avoid potential erosion <br /> and sediment control issues that may cause a violation of the NPDES Construction Stormwater permit, <br /> the Certified Erosion and Sediment Lead will promptly initiate the implementation of one or more of the <br /> alternate BMPs listed in Appendix C after the first sign that existing BMP are ineffective or failing. <br /> The project site is located west of the Cascade Mountain Crest. As such, no soils shall remain exposed <br /> and unworked for more than 7 days during the dry season (May 1 to September 30) and 2 days during <br /> the wet season (October 1 to April 30). Regardless of the time of year, all soils shall be stabilized at the <br /> end of shift before a holiday of weekend if needed based on weather forecast. <br /> In general, cut and fill slopes will be stabilized as soon as possible, and soil stockpiles will be temporarily <br /> covered with plastic sheeting. All stockpiled soils shall be stabilized from erosion, protected with <br /> sediment trapping measures, and where possible, be located away from storm drain inlets,waterways, <br /> and drainage channels. <br /> 3.1.6 Element#6—Protected Slopes <br /> All cut and fill slopes will be designed, constructed,and protected in a manner that minimizes erosion. <br /> The following specific BMPs may be used to protect slopes for this project: <br /> BMP C120: Temporary and Permanent Seeding <br /> BMP C121: Mulching <br /> BMP C123: Plastic Covering <br /> BMP C130: Surface Roughening <br /> BMP C200: Interceptor Dike and Swale <br /> BMP C207: Check Dams <br /> Cover measures should be applied to exposed slopes as soon as possible following the completion of <br /> excavation. Interim cover measures may be required if rain is anticipated during periods when large or <br /> long slopes are exposed. Plastic sheeting may be used as a temporary cover measure but is not <br /> specifically called out on the plans. <br /> 9 <br />